Mon 26 Nov 2012, 08:26 GMT

Plan to build refinery in Vietnam


New refining plant would have a capacity of 660,000 barrels per day.



Petroleum Corporation of Thailand (PTT) is planning to build a refinery with a capacity of 660,000 barrels per day in central Vietnam, according to local reports.

PTT is said to have reported its pre-feasibility study of the Nhon Hoi refinery to officials of the government of Binh Dinh Province.

Government representatives are reported to have met with Mr. Sukrit Surabotsopon – PTT Deputy Director General - on November 22, to listen to a presentation of the pre-feasibility report.

Total investment in the refinery project is estimated at $28.7 billion. With an output of 660,000 barrels per day (bpd), the Nhon Hoi facility would be one of the world's largest oil refineries.

Speaking to Dow Jones Newswire, Mr. Le Huu Loc, Chairman of the People's Committee of Binh Dinh Province, said construction of the plant is expected to start in 2016 and that the first barrels of oil would be processed in 2019.

"PTT has showed a very high determination, so we believe that they can carry out the project," Loc said.

Loc added that PTT is already in discussions with a number of Vietnamese companies to discuss the possibility of cooperation in the project. The local firms include: Vietnam Oil and Gas Group (PetroVietnam), the Petroleum Import-Export Group (Petrolimex) and the Military Petroleum Corporation.

Mr. Nattachat Charuchinda, CEO of PTT, said the crude material for the Nhon Hoi plant would be sourced from the Middle East and the project would include an aromatic processing plant for export to China.

Vietnam currently only has one oil refinery, the 130,500-bpd (6.5 million tonnes per annum) Dung Quat plant in Quang Ngai Province, which is expected to increase its capacity to 200,000 bpd (10 million tonnes per annum) by 2016-2017.

Construction of the country's second refinery, the 200,000-bpd Nghi Son plant, is expected to commence before the end of the year. Preparation work for the construction phase is virtually completed. The facility will be built in the central province of Thanh Hoa, 215 kilometres south of Hanoi, and will initially have a production capacity of 10 million tonnes per year. It is scheduled to be operational in 2014.


Caspar Gooren, Titan. Titan Clean Fuels signs e-methane supply deal with TURN2X for 2028 delivery  

Bunker supplier to receive e-methane from Spanish production plant for distribution across European ports.

Hydrogen-fuelled engine 6UEC35LSGH. Japan consortium achieves hydrogen co-firing in main engine for large commercial vessel  

Engine reaches over 95% hydrogen co-firing ratio, with installation planned for 2027.

BTB bunker truck. Belgian Trading & Bunkering expands DMA 0.89 truck deliveries in ARA region  

BTB extends marine fuel offerings with truck-based deliveries to meet maritime market demand.

Fuel pathway roundtable meeting participants. ABS convenes roundtable on offshore power barge for Great Lakes emissions reduction  

Meeting brought together ports, academia and industry to advance shore power solution under EPA programme.

Lego Ane Maersk video screenshot. Maersk marks 50-year Lego partnership with dual-fuel vessel model  

Shipping company displays an exhibition of Lego sets spanning five decades at Copenhagen headquarters.

Guo Yun Hai vessel. Cosco Shipping takes delivery of 80,000-dwt methanol-ready grain carrier  

Guo Yun Hai features box-shaped cargo hold and methanol-ready design with energy-saving devices.

CMA CGM Innovation ship-to-ship transfer. Algeciras reports record LNG bunkering volumes, claims European top-three position  

Spanish port says it supplied 333,833 cbm of LNG across 78 ship-to-ship operations in 2025.

Additional costs chart. T&E: Iran conflict costing shipping industry €340m a day in fuel costs  

Transport & Environment analysis shows marine fuel price surge has cost the industry €4.6bn since conflict began.

CF 3850 vessel render. Damen delivers second hybrid-ready combi freighter to German shipowner  

The vessel features biofuel capability and will be retrofitted with wind-assist technology with government funding.

Engine retrofit report 2026 graphic. Retrofit capability expands as regulatory uncertainty slows alternative-fuel conversions  

Lloyd’s Register warns delayed conversions could compress demand into a narrower, costlier timeframe as the fleet ages.