Tue 30 Dec 2008, 09:42 GMT

Countdown for Brazilian nominations


Bunker buyers have until 3pm today to nominate ships for Brazilian ports.



Brazilian bunker supplier Petroleo Brasileiro (Petrobras) S.A. has issued a reminder to customers today to inform them that today is the last day for nominations before Monday 5th January.

In a notice sent to clients, Petrobras said it will be accepting nominations for deliveries at Brazilian ports up to 3:00 pm Brasilia time. After this time, customers will be required to contact Petrobras next week regarding nominations.

The company's Brazilian office will be closed at the end of business today as part of its Christmas/New Year holiday schedule. It will reopen again on Monday 5th January.

Contact details for the Petrobras Bunker Department are as follows:

Telephone: +55 21 3224 4333
Telephone (AOH): +55 21 9972 6103
Email: bunker@petrobras.com.br
Website: www.petrobras.com.br

Address:
Av Republica do Chile, 65
Sala 2001
Rio de Janeiro CEP 20132-970


Bill Watts, Bernhard Schulte (Singapore) Pte Ltd. Shipping’s fuel transition faces $9 trillion funding gap, Singapore technical talk to hear  

Global merchant fleet said to be ordering alternative-fuel vessels faster than the fuels can be produced.

Rijkswaterstaat Power2Tow R&D phase launch. Netherlands launches R&D phase for electric emergency towing vessels with e-methanol as backup fuel  

Vessels will operate electrically wherever possible, while e-methanol will serve as fuel during emergency towing operations.

KPI OceanConnect Logo. KPI OceanConnect seeks marine fuel trading intern for China desk in Singapore  

Bunker firm is recruiting a bilingual staff member to support its China trading operations.

Philippos Ioulianou, EmissionLink. EmissionLink calls for clarity amid crowded regulatory landscape  

Emissions management firm calls for practical guidance to prevent duplicate carbon costs under overlapping regulatory regimes.

Shell flag. Shell forecasts sevenfold rise in LNG bunkering demand to 27m tonnes by 2035  

Annual LNG outlook projects global demand reaching nearly 700 million tonnes per year by 2050.

Opening ceremony of VPS Shanghai laboratory. VPS opens Shanghai laboratory as China’s bunker market expands  

Sixth laboratory added to global network, targeting faster fuel testing for customers in APAC region.

Heinrich Wegener & Sohn Bunkergesellschaft m.b.H. logo. Heinrich Wegener joins Global Ethanol Association  

German family-owned bunker firm joins industry body to support ethanol and methanol adoption.

Keel-laying ceremony of vessel with builder's hull no. CHB2048. Second MSC ultra-large LNG dual-fuel boxship enters dry dock at Zhoushan  

Changhong International's Daishan Base receives 19,000-teu container vessel built for MSC.

175,000-cbm LNG carrier vessel render. Deal signed to build four LNG-fuelled gas carriers  

Quartet of 175,000-cbm LNG vessels destined for Shell charter.

Launching ceremony of MSC Leticia X vessel. Changhong International launches LNG container ships and tankers for MSC and Navios  

Chinese shipbuilder launches four vessels in the space of days, spanning LNG container ships and oil tankers.