Thu 11 Dec 2014, 20:20 GMT

ABS releases guide for LNG-ready ships


Guide is designed to help owners prepare newbuildings for future conversion to gas propulsion.



The American Bureau of Shipping (ABS) - a leading global provider of classification services to the marine and offshore industries - has released a guide for LNG-ready ships.

The 'ABS Guide for LNG Fuel Ready Vessels' is designed to support members and clients in preparing newbuildings for future conversion to gas propulsion.

Its purpose it to formalize the process for companies who wish to plan for conversion to LNG fuel at a future date by providing a detailed review and approval and an associated class notation.

"ABS is a leader in LNG as fuel, with a number of newbuilding and conversion projects in progress, and there is strong interest in preparing for a future in which LNG takes a bigger role," said ABS Chairman and CEO Christopher J. Wiernicki. "The Guide for LNG Fuel Ready Vessels draws on our practical experience by providing a detailed approval process and a notation that clarifies the extent to which a vessel is LNG Fuel Ready."

The guide includes a basic level of Concept Design Approval, with a design review for approval in principle (AIP), and two optional levels for general design approval and installed equipment, which constitute a complete review and survey of the system to be installed on the ship.

The first optional level is a General Design Review that allows an owner to approach a shipyard with a reviewed design package for the gas-fueled system at the time of conversion.

The second optional level is Detail Design Approval and Installation, which constitutes a complete design review and survey of a system that will be installed on the LNG-ready ship in accordance with the ABS Guide for Propulsion and Auxiliary Systems for Gas Fueled Ships.

The first level provides an AIP and a descriptive note in the ABS Record, the second level a Statement of Compliance with a descriptive note listing the parts of the system that have been reviewed. The third level results in an LNG Fuel Ready class notation for the parts of the system that have been installed, confirming that the fuel system is in full compliance with the ABS Guide to Gas Fueled Ships at the time of the newbuilding contract.

“The projects ABS has already worked on demonstrate the variability from the designer’s and owner’s perspective of the requirements associated with the term LNG Ready,” commented ABS Vice President of Global Gas Solutions, Patrick Janssens. "Rather than rely solely on current notations and descriptive notes to express to what extent a ship is LNG ready, the ABS Guide and notation are powerful tools that go beyond the basics to help clients specify work to be done in the construction phase and when they are ready to convert."


Rolls-Royce mtu engine test bench. Rolls-Royce Power Systems switches German engine test facilities to HVO fuel  

Company saved 3,200 tonnes of CO2 by end of 2025 after switching to renewable diesel.

MSC Migsan delivery ceremony. Changhong International delivers final LNG dual-fuel container ship 205 days early  

Chinese shipbuilder completes 10-vessel series for MSC with delivery of 11,500-teu MSC Migsan.

Seoul city skyline. Oilmar seeks senior and mid-level bunker traders in Seoul  

Marine fuel firm aims to recruit experienced traders for South Korean operations.

Morten Thomas Jacobsen, GEA. Global Ethanol Association to present on ethanol marine fuel at London shipping expo  

Morten Thomas Jacobsen will discuss ethanol fuel trials and maritime decarbonisation challenges in June.

Adrian Tolson, IBIA. IBIA warns of structural shift in marine fuel market following Middle East tensions  

Association chair says geopolitical disruptions signal lasting changes to bunker supply dynamics and pricing.

HMM Hamburg vessel. Rotterdam bunker volumes plunge 25% in first quarter amid regulatory shifts  

Fossil fuel sales decline sharply while alternative fuels show modest growth in Dutch port.

Camellia Dream vessel. Norsepower completes factory tests for 18 rotor sails bound for Airbus fleet  

Wind propulsion units cleared for installation on LD Armateurs vessels targeting 50% emissions reduction.

Frankie Russ vessel. Ernst Russ acquires four chemical tankers with five-year charters worth $126m  

Hamburg shipowner enters tanker segment with methanol-ready newbuildings delivering from Q4 2026.

Ammonia fuel system component. Wärtsilä boosts ammonia engine power output to match LNG equivalent  

Finnish technology group raises Wärtsilä 25 Ammonia engine output, enabling simpler vessel designs.

Aerial view of a cruiseship at sea. Fincantieri secures order for three LNG-fuelled cruise ships from Princess Cruises  

Italian shipbuilder to construct vessels at Monfalcone yard, with deliveries scheduled through 2039.