Insurer issues 'capuccino' bunker bulletin


Members are advised to take precautionary measures to reduce the risk of being exposed to the malpractice of introducing air into fuel oil.



Mutual marine insurer West of England Insurance Services (Luxembourg) S.A. (West of England) has issued an advisory to its members regarding the introduction of air into fuel oil.

Referred to as the "capuccino effect", the malpractice of introducing air into fuel oil results in the development of froth and foam on the surface. It increases the volume of the fuel and results in artificially high volumetric flow meter readings. When post-bunkering soundings are taken it also gives the impression that the amount of fuel in the bunker tank is more than it actually is.

As the air bubbles gradually dissipate, the fuel oil soundings decrease. If a large quantity of bunkers has been stemmed and subjected to the “cappuccino effect”, the consequential shortfall may be significant.

In its bulletin, West of England includes a list precautionary measures to minimize the risk of being exposed to this fraudulent practice. They are:

- The Chief Engineer should board the barge prior to and on completion of bunkering to check the tank quantities together with the Barge Master. All tanks should be sounded including slop tanks and any compartments that may contain fuel intended for other vessels. The sounding records should be signed by both the Chief Engineer and the Barge Master.

- The temperature of the fuel oil should be measured before the transfer takes place so that the fuel oil density can be calculated accurately.

- The draughts of the bunker barge should be taken prior to commencing bunkering and on completion together with the Barge Master in order to compare the change in displacement with the quantity of fuel oil delivered.

- If all the product on board the bunker barge is to be transferred to the vessel, any attempt to introduce air into the fuel oil is likely to have taken place already as doing so during bunkering will make it appear that the vessel has been over-supplied.

- Vessels making brief bunker calls or which are supplied shortly before departure may be more at risk than others given that Masters may be under pressure to sail on completion and may be less inclined to become embroiled in a bunker dispute.

- If it is thought that compressed air may be present in the fuel oil, no reliance should be placed in volumetric or positive displacement flow meters (ie the equipment most commonly found on vessels) as they may be fooled into producing artificially high readings. Mass flow rate meters, such as versions of the Coriolis meter, will produce more accurate readings, but such devices are not generally fitted to vessels at present.

- If air in the fuel oil is found or suspected, the vessel should endeavour to wait for the air to escape after bunkering has been completed. The length of time required will depend on the viscosity and temperature of the fuel oil, as well as the size of the entrapped bubbles. The process will be quicker in tropical waters, but very small air bubbles in high viscosity fuels in cold climates may take up to two days to dissipate before accurate soundings can be taken.

- The Chief Engineer should ask the Barge Master to advise when tank stripping will be carried out. Tank stripping should be kept to a minimum and the Chief Engineer should record how long it takes to strip the barge tanks.

- Line blowing by the barge should only be permitted on completion of bunkering.

- If the Chief Engineer believes that the vessel has been supplied with fuel into which air has been introduced, samples should be taken from the affected tanks and examined in a clean glass receptacle for the presence of air bubbles. The density of the samples should also be checked. If bubbles are present and the density (allowing for any temperature change) is lower than the figure declared on the Bunker Delivery Note, these may be indications of the “cappuccino effect”.

- Detailed records of times, soundings, quantities, temperatures, densities and other key information should be maintained in case they are needed in the event of a dispute.

- Where safe and practicable, photographic and video evidence should also be taken for the same reason.

Causes of the “Cappuccino Effect”

West of England highlights three main causes of the capuccino effect:

- The bunker barge may inject compressed air into its tanks prior to joint soundings being taken to increase the apparent volume of the fuel oil before it is transferred.

- Compressed air may be injected into the fuel oil during the transfer, either in the vicinity of the discharge pump, or into the tank or into the discharge line. This may be by using the compressed air equipment designed to blow through the pipelines after discharge, or via a separate system.

- The stripping of bunker tanks using a positive displacement pump means that air will be drawn into the fuel oil when pumped. Consequently, excessive stripping by the bunker barge may also result in the “cappuccino effect”.

Signs of the “Cappuccino Effect”

West of England notes that the presence of one or more of the following may indicate that fuel supplied to the vessel contains an excessive amount of air:

- Look for foam and/or frothing on the surface of the fuel oil on the barge prior to bunkering, and on the vessel while bunkering is taking place and on completion.

- While taking soundings on the bunker barge or on the vessel, check for bubbles on the sounding tape or brass bob.

- If possible, check the bunker barge supply pump and supply pipework prior to pumping and look for any suspect connections, remembering that an air injection line may be quite small.

- Ask the bunker barge crew for details of how they carry out tank stripping and line blowing (where employed) and inspect the line blowing arrangements before bunkering commences.

- Once bunkering has commenced, open the manifold sampling point at regular intervals placing a clean glass receptacle underneath. Check the samples for frothing or an excessive amount of air bubbles.

- Unusual gurgling noises from the supply line or at the manifold may also indicate the presence of air.

- Variations in line pressure at the manifold may be an indication that air has been introduced into the line.

- Monitor the supply hose for unusual movement. When a large quantity of compressed air is passed through a hose containing fuel oil, the hose may tend to jolt or shudder.

- Listen for unusual noises from the fuel tank vent head; ball or float valves may vibrate or rattle if excessive air is present. Also check whether the amount of air being vented from the fuel tanks appears to be greater than normal.

- Check the density of the fuel oil received. A lower density than expected (taking account of any temperature change) may indicate the presence of air.

If it is suspected that air may have been introduced into the fuel oil, members are advised to board the bunker barge and ask to see the line blowing arrangements and the air compressor.

If these have recently been in use, the compressor and its connections will be warm, while the compressed air delivery line will be cold. Empty compressed air bottles may also provide an indication that the fuel oil has been injected with air.

Chart showing percentage of off-spec and on-spec samples by fuel type, according to VPS. Is your vessel fully protected from the dangers of poor-quality fuel? | Steve Bee, VPS  

Commercial Director highlights issues linked to purchasing fuel and testing quality against old marine fuel standards.

Ships at the Tecon container terminal at the Port of Suape, Brazil. GDE Marine targets Suape LSMGO by year-end  

Expansion plan revealed following '100% incident-free' first month of VLSFO deliveries.

Hercules Tanker Management and Hyundai Mipo Dockyard sign bunker vessel agreement Peninsula CEO seals deal to build LNG bunker vessel  

Agreement signed through shipping company Hercules Tanker Management.

Illustration of Kotug tugboat and the logos of Auramarine and Sanmar Shipyards. Auramarine supply system chosen for landmark methanol-fuelled tugs  

Vessels to enter into service in mid-2025.

A Maersk vessel, pictured from above. Rise in bunker costs hurts Maersk profit  

Shipper blames reroutings via Cape of Good Hope and fuel price increase.

Claus Bulch Klausen, CEO of Dan-Bunkering. Dan-Bunkering posts profit rise in 2023-24  

EBT climbs to $46.8m, whilst revenue dips from previous year's all-time high.

Chart showing percentage of fuel samples by ISO 8217 version, according to VPS. ISO 8217:2024 'a major step forward' | Steve Bee, VPS  

Revision of international marine fuel standard has addressed a number of the requirements associated with newer fuels, says Group Commercial Director.

Carsten Ladekjær, CEO of Glander International Bunkering. EBT down 45.8% for Glander International Bunkering  

CFO lauds 'resilience' as firm highlights decarbonization achievements over past year.

Anders Grønborg, CEO of KPI OceanConnect. KPI OceanConnect posts 59% drop in pre-tax profit  

Diminished earnings and revenue as sales volume rises by 1m tonnes.

Verde Marine Homepage Delta Energy's ARA team shifts to newly launched Verde Marine  

Physical supplier offering delivery of marine gasoil in the ARA region.


↑  Back to Top


 Related Links