Wed 14 Dec 2016 11:57

Third dual-fuel tug for Norwegian shipowner launched in Spain


Vessel to provide tug services for Statoil in 2017.



The last of a series of three dual-fuel tugboats to be built at the Astilleros Gondan S.A. shipyard for Norwegian shipowner Ostensjo Rederi was launched on Tuesday at the port of Figueras in Asturias, Spain.

The vessel, which is 40.2 metres long with a beam of 16 metres, will provide tug services to Norwegian energy firm Statoil in the island of Melkoya, located west of Hammerfest.

The tug has been built to operate at temperatures as low as 20 degrees below zero. It has the ability to operate on either liquefied natural gas (LNG) or diesel, thus enabling it to comply with environmental restrictions.

Built according to Robert Allan Ltd's RAstar 4000 DF design, the vessel is fitted with twin six-cylinder Wartsila 34DF engines, as well as Wartsila LNGPac fuel systems with 30-cubic-metre horizontally mounted Type C LNG fuel tanks. The tanks are expected to allow for two weeks of operation between fuellings.

Over the next few months, the new tugboat will be moored at the Figueras shipyard's quay, where it will be outfitted. Once fully constructed, Gondan says the tug will undergo "thorough and demanding" sea trials, after which it will be delivered to Ostensjo Rederi in 2017.

Image: The Hammerfest, launched on 4th July 2016, was the first of three dual-fuel tugboats built in Spain for Norwegian shipowner Ostensjo Rederi.

Chart showing percentage of off-spec and on-spec samples by fuel type, according to VPS. Is your vessel fully protected from the dangers of poor-quality fuel? | Steve Bee, VPS  

Commercial Director highlights issues linked to purchasing fuel and testing quality against old marine fuel standards.

Ships at the Tecon container terminal at the Port of Suape, Brazil. GDE Marine targets Suape LSMGO by year-end  

Expansion plan revealed following '100% incident-free' first month of VLSFO deliveries.

Hercules Tanker Management and Hyundai Mipo Dockyard sign bunker vessel agreement Peninsula CEO seals deal to build LNG bunker vessel  

Agreement signed through shipping company Hercules Tanker Management.

Illustration of Kotug tugboat and the logos of Auramarine and Sanmar Shipyards. Auramarine supply system chosen for landmark methanol-fuelled tugs  

Vessels to enter into service in mid-2025.

A Maersk vessel, pictured from above. Rise in bunker costs hurts Maersk profit  

Shipper blames reroutings via Cape of Good Hope and fuel price increase.

Claus Bulch Klausen, CEO of Dan-Bunkering. Dan-Bunkering posts profit rise in 2023-24  

EBT climbs to $46.8m, whilst revenue dips from previous year's all-time high.

Chart showing percentage of fuel samples by ISO 8217 version, according to VPS. ISO 8217:2024 'a major step forward' | Steve Bee, VPS  

Revision of international marine fuel standard has addressed a number of the requirements associated with newer fuels, says Group Commercial Director.

Carsten Ladekjær, CEO of Glander International Bunkering. EBT down 45.8% for Glander International Bunkering  

CFO lauds 'resilience' as firm highlights decarbonization achievements over past year.

Anders Grønborg, CEO of KPI OceanConnect. KPI OceanConnect posts 59% drop in pre-tax profit  

Diminished earnings and revenue as sales volume rises by 1m tonnes.

Verde Marine Homepage Delta Energy's ARA team shifts to newly launched Verde Marine  

Physical supplier offering delivery of marine gasoil in the ARA region.


↑  Back to Top