Fri 6 Jan 2017, 09:20 GMT

ABS issues LNG bunkering guide


Guide outlines requirements for the design, construction, and survey of LNG carriers and bunker supply vessels.



The American Bureau of Shipping (ABS) has launched a guide for the bunkering of liquefied natural gas (LNG).

The new 25-page document has been developed to outline the requirements for the design, construction, and survey of liquefied gas carriers and barges fitted with dedicated LNG transfer arrangements and intended to operate in regular LNG bunkering service.

The guide focuses on the requirements for bunkering of LNG, the remainder of the vessel is to comply with the applicable edition of the ABS Rules.

Users of the guide are advised that the process of bunkering LNG involves a number of interested parties, including a vessel's flag administration, national regulatory bodies and port authorities. Therefore proposals are subject to review and approval by the applicable authorities with respect to installed safety equipment, operational practices, crew training, bunkering safety distances and simultaneous operations. Accordingly ship designers, shipyards, ship owners/operators and other interested stakeholders are encouraged to determine the full applicable requirements and obtain the necessary approvals as early as possible in any LNG bunkering new construction or conversion project.

The objective of the ABS guide is to provide criteria for the design, construction, installation, survey and operation of LNG transfer arrangements, associated machinery, equipment and systems in order to minimize risks to the vessel, crew and the environment. Requirements are provided to achieve this objective in accordance with the following key principles and requirements:

- Vessel construction is in accordance with the ABS Rules for Building and Classing Steel Vessels (Steel Vessel Rules), ABS Rules for Building and Classing Steel Vessels Under 90 Meters (295 feet) in Length (Under 90m Rules), ABS Rules for Building and Classing Steel Barges (Barge Rules) or the ABS Rules for Building and Classing Steel Vessels for Service on Rivers and Intracoastal Waterways (River Rules), as applicable.

- LNG containment systems are designed in accordance with Chapter 4 of the IGC Code, as incorporated by Section 5C-8-4 of the Steel Vessel Rules.

- LNG tank pressure, temperature and loading/filling limits are maintained within the design limits of the tank at all times.

- Means are provided to evacuate, purge and gas-free the LNG tanks. - LNG tanks are in a protected location.

- LNG containment spaces, bunkering stations and machinery spaces containing LNG or gas processing equipment are located and arranged such that the risk of any release of liquid or vapor will be minimized. Arrangements are provided for safe access during operations and inspections.

- LNG piping, systems and arrangements provide safe handling of liquid and vapor under all operating conditions. Means are provided to inert and gas free piping and systems.

- Bunker stations are arranged to provide compatible LNG transfer.

- Automation, instrumentation, monitoring and control systems are provided to minimize the risks with carriage, distibution and bunkering of LNG.

- Operation and maintenance manuals are provided for all LNG containment and transfer equipment and systems covering operation, maintenance and repair procedures.


Bermuda Container Line (BCL) logo. Bermuda Container Line imposes emergency bunker surcharge citing Iran War fuel price spike  

Shipping operator to add $150 per TEU charge from 1 May amid geopolitical fuel cost pressures.

China flag. Zhejiang’s first methanol-powered container ship launches in Jiaxing  

Vessel uses methanol propulsion technology to reduce carbon dioxide emissions by 90%.

TES flag with a model vessel in the background. TES joins SEA-LNG coalition to advance e-methane as marine fuel  

Green energy company targets 1m tonnes annual e-methane production by 2030 for shipping decarbonisation.

Ethanol and methanol workshop graphic. IBIA to host workshop on ethanol and methanol marine fuels during Singapore Maritime Week  

Half-day event will examine alcohol-based fuel pathways and integration into shipping’s multi-fuel landscape.

Steel-cutting ceremony for 13,000-dwt vessel. ROC begins construction of second chemical tanker for Essberger  

Chinese shipbuilder holds steel-cutting ceremony for 13,000-dwt methanol-ready vessel with ice class capability.

Norsepower and CHIC sign agreement. Norsepower and Cosco Shipping Heavy Industry Equipment sign wind propulsion cooperation agreement  

Wind propulsion technology provider partners with Chinese shipyard to scale rotor sail production.

Wärtsilä logo. Shipping firms struggle to prioritise decarbonisation investments amid regulatory uncertainty, Wärtsilä survey finds  

Survey of 225 maritime executives reveals 70% say uncertainty hinders investment decisions despite regulatory pressure.

IMT Isca G-Flex vessel render. Longitude Engineering unveils IMT Isca G-Flex PSV design with alternative fuel capability  

Naval architecture firm launches adaptable platform support vessel design based on the IMT-984 G-Class hull.

Philippos Ioulianou, EmissionLink. Shore power infrastructure is key to cutting ferry emissions in European cities, says EmissionLink  

Port electrification is needed to enable vessels to switch off engines at berth, reducing urban pollution.

Maritime and Port Authority of Singapore logo. Singapore prioritises maritime resilience amid geopolitical uncertainty, eyes digitalisation and green fuels  

MPA chief outlines the sector’s adaptation to supply chain disruptions while advancing automation and alternative fuels.