Fri 6 Jan 2017 09:20

ABS issues LNG bunkering guide


Guide outlines requirements for the design, construction, and survey of LNG carriers and bunker supply vessels.



The American Bureau of Shipping (ABS) has launched a guide for the bunkering of liquefied natural gas (LNG).

The new 25-page document has been developed to outline the requirements for the design, construction, and survey of liquefied gas carriers and barges fitted with dedicated LNG transfer arrangements and intended to operate in regular LNG bunkering service.

The guide focuses on the requirements for bunkering of LNG, the remainder of the vessel is to comply with the applicable edition of the ABS Rules.

Users of the guide are advised that the process of bunkering LNG involves a number of interested parties, including a vessel's flag administration, national regulatory bodies and port authorities. Therefore proposals are subject to review and approval by the applicable authorities with respect to installed safety equipment, operational practices, crew training, bunkering safety distances and simultaneous operations. Accordingly ship designers, shipyards, ship owners/operators and other interested stakeholders are encouraged to determine the full applicable requirements and obtain the necessary approvals as early as possible in any LNG bunkering new construction or conversion project.

The objective of the ABS guide is to provide criteria for the design, construction, installation, survey and operation of LNG transfer arrangements, associated machinery, equipment and systems in order to minimize risks to the vessel, crew and the environment. Requirements are provided to achieve this objective in accordance with the following key principles and requirements:

- Vessel construction is in accordance with the ABS Rules for Building and Classing Steel Vessels (Steel Vessel Rules), ABS Rules for Building and Classing Steel Vessels Under 90 Meters (295 feet) in Length (Under 90m Rules), ABS Rules for Building and Classing Steel Barges (Barge Rules) or the ABS Rules for Building and Classing Steel Vessels for Service on Rivers and Intracoastal Waterways (River Rules), as applicable.

- LNG containment systems are designed in accordance with Chapter 4 of the IGC Code, as incorporated by Section 5C-8-4 of the Steel Vessel Rules.

- LNG tank pressure, temperature and loading/filling limits are maintained within the design limits of the tank at all times.

- Means are provided to evacuate, purge and gas-free the LNG tanks. - LNG tanks are in a protected location.

- LNG containment spaces, bunkering stations and machinery spaces containing LNG or gas processing equipment are located and arranged such that the risk of any release of liquid or vapor will be minimized. Arrangements are provided for safe access during operations and inspections.

- LNG piping, systems and arrangements provide safe handling of liquid and vapor under all operating conditions. Means are provided to inert and gas free piping and systems.

- Bunker stations are arranged to provide compatible LNG transfer.

- Automation, instrumentation, monitoring and control systems are provided to minimize the risks with carriage, distibution and bunkering of LNG.

- Operation and maintenance manuals are provided for all LNG containment and transfer equipment and systems covering operation, maintenance and repair procedures.


Philippe Berterottière and Matthieu de Tugny. GTT unveils cubic LNG fuel tank design for boxships with BV approval  

New GTT CUBIQ design claims to reduce construction time and boost cargo capacity.

Wilhelmshaven Express, Hapag-Lloyd. Hapag-Lloyd secures multi-year liquefied biomethane supply deal with Shell  

Agreement supports container line's decarbonisation strategy and net-zero fleet operations target by 2045.

Dual-fuel ship. Dual-fuel vessels will dominate next decade, says Columbia Group  

Ship manager predicts LNG-powered vessels will bridge gap until zero-carbon alternatives emerge.

Stril Poseidon vessel. VPS campaign claims 12,000 tonnes of CO2 savings across 300 vessels  

Three-month efficiency drive involved 12 shipping companies testing operational strategies through software platform.

Birdseye view of a ship. Gard warns of widespread cat fines surge in marine fuel  

Insurer reports elevated contamination levels, echoing VPS circular in early September.

Christoffer Ahlqvist, ScanOcean. ScanOcean opens London office to expand global bunker trading operations  

New office will be led by Christoffer Ahlqvist, Head of Trading.

Aurora Expeditions' Sylvia Earle. Aurora Expeditions claims 90% GHG reduction in landmark HVO trials  

Sylvia Earle said to be the first Infinity-class ship to trial HVO biofuel.

Molslinjen ferry illustration. Wärtsilä wins contract for electric propulsion systems on two Danish ferries  

Technology group to supply integrated electric systems for Molslinjen's battery-electric catamarans.

Manja Ostertag, Bunker Holding. Bunker Holding executive to address biofuels at Berlin event  

Manja Ostertag will discuss production scaling and supply chain integration at September forum.

Svitzer Ingrid tugboat naming ceremony. Denmark's first electric tug named as Svitzer advances decarbonisation goals  

Svitzer Ingrid said to reduce annual CO₂ emissions by 600-900 tonnes using battery power.