Wed 18 Mar 2015 10:51

GIB moves to whole new level...on different floor


Glander International Bunkering's Dubai office now occupies the entire 29th floor of the Liwa Heights building.



Glander International Bunkering (GIB) has announced that it has moved to a new office located in its current building but on a different floor.

"The new office takes the entire 29th floor of the Liwa Heights building [pictured] thus ensuring that the space accommodates for continuous growth," the company said in a statement.

"The 29th floor office features large working spaces, numerous meeting rooms, a staff canteen and a board room accommodating up to 35 people at a time," Glander International Bunkering added.

Commenting on the new office, Managing Director and CEO of the Glander International Bunkering Group, Christoffer Berg Lassen remarked: "Over the last 14 months we have had tremendous growth globally. In our head office of Dubai alone, staff numbers have increased from 19 to 33. Our vision for the future is to continue to grow and prosper. This large scale office will allow for this and the working environment we have created will continue to fuel productivity in the workplace."

The company's new contact details are as follows:

Address:
29th floor, Office No. 2908
Liwa Heights, Cluster W
Jumeirah Lakes Towers, Dubai
P.O. Box 283 933
United Arab Emirates

Phone: +971 4 437 1700
Fax: +971 4 428 1560
Website: www.gibunkering.com
Email: dubai@gibunkering.com

Image: Liwa Heights building, Dubai.

Opening of the IMO Marine Environment Protection Committee (MEPC), 83rd Session, April 7, 2025. IMO approves pricing mechanism based on GHG intensity thresholds  

Charges to be levied on ships that do not meet yearly GHG fuel intensity reduction targets.

Preemraff Göteborg, Preem's wholly owned refinery in Gothenburg, Sweden. VARO Energy expands renewable portfolio with Preem acquisition  

All-cash transaction expected to complete in the latter half of 2025.

Pictured: Biofuel is supplied to NYK Line's Noshiro Maru. The vessel tested biofuel for Tohoku Electric Power in a landmark first for Japan. NYK trials biofuel in milestone coal carrier test  

Vessel is used to test biofuel for domestic utility company.

Pictured (from left): H-Line Shipping CEO Seo Myungdeuk and HJSC CEO Yoo Sang-cheol at the contract signing ceremony for the construction of an 18,000-cbm LNG bunkering vessel. H-Line Shipping orders LNG bunkering vessel  

Vessel with 18,000-cbm capacity to run on both LNG and MDO.

Stanley George, VPS Group Technical and Science Manager, VPS. How to engineer and manage green shipping fuels | Stanley George, VPS  

Effective management strategies and insights for evolving fuel use.

Sweden flag with water in background. Swedish government bans scrubber wastewater discharges  

Discharges from open-loop scrubbers to be prohibited in Swedish waters from July 2025.

The ME-LGIA test engine at MAN's Research Centre Copenhagen. MAN Energy Solutions achieves 100% load milestone for ammonia engine  

Latest tests validate fuel injection system throughout the entire load curve.

Terminal Aquaviário de Rio Grande (TERIG), operated by Transpetro. Petrobras secures ISCC EU RED certification for B24 biofuel blend at Rio Grande  

Blend consisting of 24% FAME is said to have been rigorously tested to meet international standards.

Avenir LNG logo on sea background. Stolt-Nielsen to fully control Avenir LNG with acquisition  

Share purchase agreement to buy all shares from Golar LNG and Aequitas.

Seaspan Energy's 7,600 cbm LNG bunkering vessel, s1067, built by Nantong CIMC Sinopacific Offshore & Engineering Co., Ltd. Bureau Veritas supports launch of CIMC SOE's LNG bunkering vessel  

Handover of Seaspan Energy's cutting-edge 7,600-cbm vessel completed.


↑  Back to Top