Thu 15 Jan 2015 20:02

Skangass commissions LNG bunker vessel


Vessel is to operate in Skagerrak, Kattegat and the Baltic Sea.



Skangass has announced that it will make liquefied natural gas (LNG) more readily available as a marine fuel in Skagerrak, Kattegat and the Baltic Sea by operating the Coralius, a new specialised bunker vessel.

Skangass has entered into a long-term agreement for the vessel, which is designed to offer greater flexibility by operating as a ship-to-ship bunker vessel, as well as a feeder. The new vessel is scheduled to be ready in early 2017.

"Skangass has a profound belief in the potential growth of LNG as fuel for the marine market. Consequently, the company has taken another major step in developing this market by entering into a long-term charter for the 5.800 m3 bunker vessel Coralius," the company said in a statement.

"The vessel will provide easy access to LNG bunkering to customers and limit the operational impact of calling a port in order to bunker. During the design phase, great emphasis has been placed on the ship's systems for ship-to-ship operation to ensure that she is optimised to perform LNG bunkering offshore," Skangass added.

Tor Morten Osmundsen, CEO of Skangass, remarked: "Recently, we entered into our first ship-to-ship bunker contract with NEOT in Finland. Building the new vessel Coralius is the natural step for meeting this demand, and further developing our marine LNG supply chain. Although we already satisfy our marine clients' needs by truck-to-ship and terminals-to-ship bunkering, we need to further develop the infrastructure. By doing so, we will also be in a much stronger position to meet steadily rising demand for LNG."

Skangass said: "Coralius will deliver LNG to marine clients in a flexible and safe way, offering excellent accessibility and high transfer rates to minimise bunker time. The increasing demand for LNG from marine customers can be attributed to LNG being a clean fuel that meets MARPOL Protocol regulations that require sulphur emissions to be lower than 0.1% in the ECA area (Emission Control Area)."

The Coralius construction project forms part of the Flexi Joint Industry Project (JIP), which is one of the pilot projects of the European Union (EU) project Pilot LNG - an initiative that was set up to establish an LNG bunkering infrastructure within the EU.

Skangass developed the Coralius project in cooperation with Anthony Veder and Sirius.

The Coralius is to be built by the shipyard Royal Bodewes in the Netherlands. The vessel will be owned by the Swedish/Dutch joint venture Sirius Veder Gas AB and operated by Sirius Rederi AB of Sweden.


Map of US Gulf. Peninsula extends US Gulf operation offshore  

Supplier to focus on Galveston Offshore Lightering Area (GOLA) in strategy to serve growing client base.

The M/T Jutlandia Swan, operated by Uni-Tankers. Uni-Tankers vessel gets wind-assisted propulsion  

Fourth tanker sails with VentoFoil units as manufacturer says suction wing technology is gaining traction.

Port of Gothenburg Energy Port. Swedish biomethane bunkered in Gothenburg  

Test delivery performed by St1 and St1 Biokraft, who aim to become large-scale suppliers.

Image from Cockett Marine Oil presentation. Cockett to be closed down after 45 years  

End of an era as shareholders make decision based on 'non-core nature' of Cockett's business.

Petrobras logo. Petrobras confirms prompt availability of VLS B24 at Rio Grande  

Lead time for barge deliveries currently five days.

Opening of the IMO Marine Environment Protection Committee (MEPC), 83rd Session, April 7, 2025. IMO approves pricing mechanism based on GHG intensity thresholds  

Charges to be levied on ships that do not meet yearly GHG fuel intensity reduction targets.

Preemraff Göteborg, Preem's wholly owned refinery in Gothenburg, Sweden. VARO Energy expands renewable portfolio with Preem acquisition  

All-cash transaction expected to complete in the latter half of 2025.

Pictured: Biofuel is supplied to NYK Line's Noshiro Maru. The vessel tested biofuel for Tohoku Electric Power in a landmark first for Japan. NYK trials biofuel in milestone coal carrier test  

Vessel is used to test biofuel for domestic utility company.

Pictured (from left): H-Line Shipping CEO Seo Myungdeuk and HJSC CEO Yoo Sang-cheol at the contract signing ceremony for the construction of an 18,000-cbm LNG bunkering vessel. H-Line Shipping orders LNG bunkering vessel  

Vessel with 18,000-cbm capacity to run on both LNG and MDO.

Stanley George, VPS Group Technical and Science Manager, VPS. How to engineer and manage green shipping fuels | Stanley George, VPS  

Effective management strategies and insights for evolving fuel use.


↑  Back to Top