Tue 7 Jun 2011 06:13

Aegean expands ARA market fleet


Double-hull barge to operate in the Antwerp-Rotterdam-Amsterdam region.



Aegean Marine Petroleum Network Inc. has announced that it has taken delivery of the Montana, a 4,560 dwt double-hull newbuild barge from Santierul Naval Constanta SA in Romania and outfitted at Teamco Shipyard in Heuzden, Holland.

The estuary barge, which was purchased in connection with the 2010 acquisition of Verbeke Bunkering N.V., has been deployed to the Antwerp-Rotterdam-Amsterdam (ARA) region.

Commenting on the latest addition to the company's fleet E. Nikolas Tavlarios, President, commented: "With the delivery of the Montana, Aegean has increased its delivery capacity in the world's second largest bunkering market. This new double-hull barge provides our company with greater operational flexibility in the safe and reliable transportation and distribution of multiple grades of fuel in order to meet the needs of our high credit quality customers.

"Consistent with our objective to increase utilization and drive future earnings, we expect to complete our fully funded newbuild program in 2011 as we continue to enter new and attractive markets," Tavlarios said.


Lease agreement between Inter Terminals Sweden and the Port of Gothenburg, signed on July 1st. Pictured: Göran Eriksson, CEO of the Port of Gothenburg (left) and Johan Zettergren, Managing Director of Inter Terminals Sweden (right). New Gothenburg lease an opportunity to expand green portfolio: Inter Terminals  

Bunker terminal operator eyes tank conversion and construction projects for renewable products.

Map of US Gulf. Peninsula extends US Gulf operation offshore  

Supplier to focus on Galveston Offshore Lightering Area (GOLA) in strategy to serve growing client base.

The M/T Jutlandia Swan, operated by Uni-Tankers. Uni-Tankers vessel gets wind-assisted propulsion  

Fourth tanker sails with VentoFoil units as manufacturer says suction wing technology is gaining traction.

Port of Gothenburg Energy Port. Swedish biomethane bunkered in Gothenburg  

Test delivery performed by St1 and St1 Biokraft, who aim to become large-scale suppliers.

Image from Cockett Marine Oil presentation. Cockett to be closed down after 45 years  

End of an era as shareholders make decision based on 'non-core nature' of Cockett's business.

Petrobras logo. Petrobras confirms prompt availability of VLS B24 at Rio Grande  

Lead time for barge deliveries currently five days.

Opening of the IMO Marine Environment Protection Committee (MEPC), 83rd Session, April 7, 2025. IMO approves pricing mechanism based on GHG intensity thresholds  

Charges to be levied on ships that do not meet yearly GHG fuel intensity reduction targets.

Preemraff Göteborg, Preem's wholly owned refinery in Gothenburg, Sweden. VARO Energy expands renewable portfolio with Preem acquisition  

All-cash transaction expected to complete in the latter half of 2025.

Pictured: Biofuel is supplied to NYK Line's Noshiro Maru. The vessel tested biofuel for Tohoku Electric Power in a landmark first for Japan. NYK trials biofuel in milestone coal carrier test  

Vessel is used to test biofuel for domestic utility company.

Pictured (from left): H-Line Shipping CEO Seo Myungdeuk and HJSC CEO Yoo Sang-cheol at the contract signing ceremony for the construction of an 18,000-cbm LNG bunkering vessel. H-Line Shipping orders LNG bunkering vessel  

Vessel with 18,000-cbm capacity to run on both LNG and MDO.


↑  Back to Top


 Recommended