Thu 24 May 2018, 12:58 GMT

Gazprom, Mitsui form advisory body for joint LNG projects


Two firms discuss cooperation, which includes LNG bunkering in the Sea of Japan.


Delegates from Gazprom and Mitsui discussed their LNG cooperation at the St. Petersburg International Economic Forum on May 24, 2018.
Image credit: Gazprom
The heads of Gazprom and Mitsui met in St. Petersburg on Thursday to discuss the status of their LNG cooperation.

Alexey Miller, chairman of Gazprom's Management Committee, and Tatsuo Yasunaga, CEO of Mitsui, held a working meeting where they focused on their cooperation in small- and mid-scale LNG, as well as the construction of the third train of the Sakhalin II LNG plant.

It was noted that, as part of those efforts, an advisory body had been established for the purpose of evaluating potential joint projects.

Back in September, the two companies signed a framework agreement where they agreed to collaborate in the production, transport and marketing of small- and mid-scale LNG in Japan, as well as LNG bunkering in the Sea of Japan.

Prior to that, in December 2016, the two companies had also inked an agreement of strategic cooperation that included the LNG bunkering of ships and the Sakhalin II project expansion.

Gazprom and Mitsui are partners in the Sakhalin II project, which includes Russia's only active LNG plant. Sakhalin II is operated by Sakhalin Energy Investment Company Ltd, which is owned by Gazprom (50 percent plus one share), Shell (27.5 percent minus one share), Mitsui (12.5 percent), and Mitsubishi (10 percent).

In 2016, the LNG plant produced upward of 10.9 million tonnes of LNG, exceeding the annual design capacity by over 1.3 million tonnes.


Cosco Shipping Libra vessel. World’s first full methanol dual-fuel retrofit completes maiden voyage  

Cosco Shipping Libra covered 27,800 nautical miles on a 106-day voyage after main and auxiliary engine conversion.

PetroChina Petroineos Trading logo. PetroChina International seeks bunker trader for Rotterdam as it expands ARA marine fuel operations  

Chinese energy trader aims to boost alternative fuels portfolio and market share in Europe.

MyStar vessel truck-to-ship bunkering. Tallink Group moves towards 100% renewable fuel on Helsinki–Tallinn route  

Megastar and MyStar ferries to run entirely on liquefied biomethane supplied by Elenger.

Site visit at Petronor's synthetic fuels plant at the Port of Bilbao. Petronor’s synthetic fuel plant at the port of Bilbao to begin operations in 2027  

Repsol-owned refiner expects annual production capacity of 2,000 tonnes from €146m facility using captured CO2.

Keel-laying ceremony of Carlotta Cosulich. Fratelli Cosulich lays keel for third methanol-ready bunker tanker in China  

Carlotta Cosulich is part of a four-vessel series designed to support the alternative marine fuels transition.

Vessels at sea render. Kongsberg Maritime to design and equip four methanol-ready tankers for Transpetro  

Norwegian firm wins NOK 300m contract for Brazilian-built vessels through Consórcio MareNova partnership.

Renewable ammonia project pipeline by region chart. Clean ammonia project pipeline shrinks as offtake agreements remain scarce  

Renewable ammonia pipeline falls 0.9 Mt while only 3% of projects secure binding supply deals.

Global Ethanol Association (GEA) logo. Thoen Bio Energy joins Global Ethanol Association  

Shipping group with Brazilian ethanol ties becomes member as association plans export-focused project group.

Geiranger Fjord, Norway. Norway enforces zero-emission rules for cruise ships in World Heritage fjords  

Passenger vessels under 10,000 GT must use zero-emission fuels in Geirangerfjord and Nærøyfjord from January 2026.

D-Flex PSV design render. Longitude unveils compact PSV design targeting cost efficiency  

Design consultancy launches D-Flex vessel as a cost-efficient alternative to larger platform supply vessels.