Tue 27 Oct 2015, 09:08 GMT

Bureau Veritas publishes LNG bunkering notation


Vessels meeting the new standards will be awarded the notation 'LNG Bunkering Ship'.



Leading classification society Bureau Veritas has published requirements for liquefied natural gas (LNG) bunkering tankers. The requirements, set out in Rule Note NR 620 LNG Bunkering Ship, cover special arrangements for ships carrying LNG which will transfer that LNG to ships using LNG as fuel.

Jean-Francois Segretain, Technical Director, Bureau Veritas Marine & Offshore Division, remarked: "Establishing a secure and safe LNG bunkering chain is the key to a swift uptake of LNG fuel across shipping. We believe that small-scale LNG bunker vessels will play a key role in developing that chain. These rules help ensure safe development of this new type of ships. Of the fifteen or so small-scale LNG ships ordered so far, ten are to BV class, so we are driving this sector forward."

NR 620 covers the design and installation of the LNG transfer systems from bunkering ship to the receiving ship and the vapour transfer system from the receiving ship to bunkering ship, including LNG hoses, transfer arms and auxiliary systems for handling the LNG system. The design and installation of the equipment intended for boil-off gas management on the bunkering ship and the design and installation of the gas piping system of the bunkering ship are also set out. There is a separate section on safety arrangements.

Vessels meeting the standards will be awarded the notation LNG Bunkering Ship.

For ships which provide extra facilities or services set out in the rule note additional notations will cover:

RE - The additional service feature RE is assigned to LNG bunkering ships designed to receive LNG from a gas-fuelled ship for which the LNG fuel tanks have to be emptied.

Initial-CD - The additional service feature Initial-CD is assigned to LNG bunkering ships designed for initial cooling down of the receiving ship LNG fuel tank.

IG-Supply - The additional service feature IG-Supply is assigned to LNG bunkering ships designed to supply inert gas and dry air, to ensure gas freeing and aeration, to a gas-fuelled ship which is designed in accordance with IGF Code, paragraph 6.10.4.

BOG - The additional service feature BOG is assigned to LNG bunkering ships designed to receive and manage the boil-off gas from the receiving ship generated during the bunkering operation.


Eleven Energy logo. Eleven Energy recruiting trader for new Singapore office  

Saudi bunkering firm looking to hire in Asian city-state ahead of planned January 2027 start date.

Singapore skyline. VPS advertises for bunker surveyor role in Singapore  

Testing and inspection firm seeks candidate to conduct bunker fuel surveys under Singapore Standards SS 648 and SS 600.

RCL vessels naming ceremony. RCL names first three of eight dual-fuel-ready 4,488-TEU vessels in China  

Regional Container Lines takes delivery of Anitta Bhum on day of naming ceremony.

Peak Skarv 4 vessel. Skarv Shipping completes newbuilding programme with delivery of ammonia-ready Peak Skarv 4  

Short-sea operator takes delivery of fourth vessel from Huanghai Shipyard, with ammonia-fuelled vessel next.

Diamond Gas Nexus vessel. NYK names dual-fuel LNG carrier for Cameron LNG project  

New vessel to support LNG transportation for US project in which Mitsubishi Corporation and NYK participate.

ULSTEIN SX222 offshore wind vessel render. PaxOcean signs design contract with Ulstein for methanol-ready offshore wind vessel  

PaxOcean and Ulstein agree design contract for an SX222 service operation vessel, prepared for methanol and electric operations.

NYK and IMO officials. NYK shares two years of ammonia-fuelled tugboat data with IMO  

Shipping company presents operational insights from Sakigake and updates on its ammonia-fuelled gas carrier at IMO session.

Type approval test (TAT) for H35CDF engine. HD Hyundai completes type approval test for new LNG dual-fuel engine  

Latest HiMSEN engine is claimed to offer reduced methane slip compared with previous models.

Flag of Brazil. Petrobras resumes bunkering operations at Rio Grande Terminal after power restoration  

Brazilian supplier restarts marine fuel supply after completing an inspection following an electricity outage.

Stena E-Flexer vessel render. Stena RoRo orders battery-ready E-Flexer 2.0 ferries from Chinese yard  

Vessels include diesel engines capable of running on biodiesel and are methanol-ready.