Mon 11 Mar 2013 09:04

Overview of LNG bunkering regulatory framework


Document includes a list of 43 items related to the bunkering of gas-fuelled ships.



The European Maritime Safety Agency (EMSA) has published a document entitled: 'Overview and gaps of the regulatory framework for bunkering of gas-fuelled ships'.

Included in the document is a list of 43 items, which are divided into three main setions: 'onshore regulations', 'maritime regulations' and 'bunkering regulations'.

Of the 18 'bunkering regulations' in the list, only one - LNG fuel transfer systems, ISO 28460 EN 1474 - is currently regulated.

A list of the bunkering items and comments has been provided below.

* Definition of the LNG bunkering process - Guidelines under development. Not planned as international standard, yet.

* LNG bunkering procedures, STS - Guidelines under development. Not planned as international standard, yet.

* LNG bunkering procedures, TTS - Guidelines under development. Not planned as international standard, yet.

* LNG bunkering procedures, PTS - Guidelines under development. Not planned as international standard, yet.

* LNG bunkering procedures, Mobile tanks - Handling procedures for mobile tanks are not foreseen within the current rule development; neither in the IGF Code nor in the ISO TC 67 WG 10 Guidelines.

* LNG fuel transfer systems

* LNG ship to delivering facility interfaces - Functional requirements for the bunker interfaces are under development by ISO TC 67 WG 10.Design and operational requirements should be considered.

* LNG bunker port operations - Resulting from the "Study on Standards and Rules for bunkering gas fuelled ships" an extension of the scope of ISO 28460 could be possible to create a suitable Standard for bunkering LNG as fuel from Shore to ships. Decisions and activities regarding this recommendation are not started, yet. The International Association of Ports and Harbors established own working groups defining requirements and guidelines for bunkering LNG within port areas. Finalising dates and application to International Standards are not foreseeable.

* LNG bunkering safety distances - Common safety distances are not defined. The current Draft of the ISO TC 67 WG 10 Guidelines contain a chapter "Calculation of safety distances". The approach should be cross checked with requirements of ISO 28460.

* LNG bunkering risk assessment and risk acceptance criteria - Within the ISO TC 67 WG 10 Guidelines a risk assessment approach and as well acceptance driteria are foreseen. The guidelines are not yet finalized.

* LNG bunkering during loading / unloading and passenger embarking / disembarking - Within the ISO TC 67 WG 10 Guidelines loading / unloading and passenger embarking / disembarking processes are adressed to the risk assessment procedure. Detailed design requirements are not defined within the ISO TC 67 WG 10 guidelines and the draft IGF code.

* LNG bunker related Emergency Plans - Procedures are not defined and not in the scope of the current rule development.

* LNG fuel sampling - Procedures for sampling gas fuelled ships not defined and not in the scope of the current rule development.

* LNG fuel measurement - Procedures for LNG fuel management are not defined and not in the scope of the current rule development.

* LNG marine fuel quality - The specifications for LNG as fuel are not defined. Currently under discussion during the ISO TC 67 WG 10 work.

* LNG suplhur content - Procedures for the measurement of the sulphur content of LNG as fuel are not defined and not in the scope of the current rule development.

* Accreditation criteria LNG bunker company - Accrediation criteria for LNG bunker companies are not defined, yet.

* Environmental requirements - Basic statement to avoid the release of methane to atmosphere are stated but no pocedures are defined.

To view the EMSA document, please click on the following link:

Overview and gaps of the regulatory framework for bunkering of gas-fuelled ships


Christian Vandvig Finnerup, Dan-Bunkering. Dan-Bunkering appoints Christian Vandvig Finnerup as US managing director  

Finnerup transitions from Singapore role to lead American operations.

Hai Gang Wei Lai vessel. SIPG orders Wärtsilä systems for new LNG bunker vessel  

Shanghai International Port Group orders integrated cargo handling and fuel systems from Wärtsilä.

Chris Seide, Integr8 Fuels and William Kanavan, Pentarch Offshore Solutions. Integr8 Fuels signs MOU with Pentarch for bunker services at Port of Edrom  

Integr8 Fuels and Pentarch Offshore Solutions have signed an agreement to develop bunker fuel services.

Eagle Vellore vessel. MISC orders two LNG dual-fuel Suezmax tankers as part of fleet renewal  

Malaysian shipowner expands dual-fuel fleet with newbuilds backed by long-term charters.

Eunice Low, Oilmar DMCC. Oilmar DMCC appoints Eunice Low as marine fuels trader in Singapore  

Low joins firm's Singapore trading department with a decade of industry experience.

HMM container ship. HD Hyundai secures $1.46bn order for eight LNG dual-fuel container ships  

South Korean shipbuilder reports highest container ship order volume since 2007 supercycle.

Arctic black carbon emissions urgency graphic. Clean Arctic Alliance urges IMO action on black carbon after 'disappointing' COP30  

Environmental coalition calls for Arctic shipping fuel regulations ahead of December 5 deadline.

Egypt's Ministry of Petroleum and Mineral Resources and Suez Canal Authority MOU Signing Ceremony. Egypt's petroleum ministry and Suez Canal Authority sign MOU for LNG bunkering facility  

Ministry and canal authority to develop LNG supply station in Port Said.

Legend of the Seas main engine startup. Meyer Turku starts first main engine on Legend of the Seas cruise ship  

Finnish shipbuilder fires up Wärtsilä engine ahead of 2025 Royal Caribbean delivery.

Malik Energy Leadership Development Programme group photo. Malik Energy launches internal leadership development programme  

Marine fuel supplier rolls out training initiative for managers across its supply and energy divisions.