Wed 24 Feb 2010 08:04

Jüngerhans orders slow steaming upgrade kits


Shipowner to retrofit two of its vessels with slow steaming upgrade kits in order to cut fuel costs.



Wärtsilä, the marine industry's leading ship power system integrator, has signed a contract with the German shipowner Jüngerhans, to refit two of its vessels with Wärtsilä Slow Steaming Upgrade Kits to cut fuel costs. The 1997-built vessels - MS Klaus J and MS Helene J - are equipped with 7-cylinder Wärtsilä RTA62U main engines.

"The Wärtsilä Slow Steaming Upgrade Kits will give these ships considerable flexibility for adapting to the prevailing challenging market conditions. They offer considerable cost savings when slow steaming the ships, while retaining the capability for full speed whenever necessary," said Herm Jüngerhans, Managing Director, Jüngerhans.

In response to over-capacity in the market and a desire to cut overall fuel consumption, during recent months charterers have adjusted both their services and the speed of their ships. Slow steaming has become an established way of operating vessels, particularly in the container segment. Slow steaming offers clear benefits for charterers in terms of substantially reduced fuel consumption and considerable savings in overall ship operation costs.

Wärtsilä Slow Steaming Upgrade Kit

For ships powered by Wärtsilä RTA and RT-flex low-speed engines with more than one turbocharger, Wärtsilä introduced its Slow Steaming Upgrade Kit in 2008. The kit enables ship owners and operators to achieve major savings in fuel costs by allowing them to slow steam their ships.

"The Slow Steaming Upgrade Kit both extends the load range of the engine for continuous operation, and significantly reduces BSFC (brake specific fuel consumption) in the low-load range," explained Jürgen Gerdes, Director, Services, Wärtsilä in Switzerland.

The Wärtsilä Upgrade Kit Slow Steaming also aims to help ship owners, operators and charterers increase the flexibility of their engines, permitting them to run anywhere from 10% to 100% maximum load without operational restrictions, and to decrease the risk of engine fouling and excessive component temperatures.

The BSFC figures that can be achieved are strongly dependent on the final NOX emission balances over the entire load range. For ships that must comply with the IMO NOX emission regulations, the restrictions imposed by the emissions limits will be evaluated in each case and a customized solution package offered, Wärtsilä said.

"Operational flexibility was a major factor in our decision to choose Wärtsilä's solution. We foresee that the upgrade kit will give our vessels even more competitive advantages. We wanted to have a reliable slow steaming solution in order to be attractive in the market and this gives us an advantage over other charterers," added Herm Jüngerhans.

Other orders and first operating results

With the order from Jüngerhans, the total amount of ordered upgrade kits has increased to twelve, and Wärtsilä says it is already able to assess the initial operating results for its Slow Steaming Upgrade Kit.

For an 8-cylinder Wärtsilä RTA62U engine, Wärtsilä said it was possible to achieve fuel savings of up to 6-10 g/kWh in the optimal load range. On a 12-cylinder Wärtsilä RT-flex96C engine equipped with three turbochargers, the measured fuel savings of 8-12 g/kWh were slightly higher because the achievable savings are related to the number of turbochargers.

"Since installation, the vessels have been running successfully and the customers have had the flexibility of choosing whether to slow steam or not," Wärtsilä said.

Chart showing percentage of off-spec and on-spec samples by fuel type, according to VPS. Is your vessel fully protected from the dangers of poor-quality fuel? | Steve Bee, VPS  

Commercial Director highlights issues linked to purchasing fuel and testing quality against old marine fuel standards.

Ships at the Tecon container terminal at the Port of Suape, Brazil. GDE Marine targets Suape LSMGO by year-end  

Expansion plan revealed following '100% incident-free' first month of VLSFO deliveries.

Hercules Tanker Management and Hyundai Mipo Dockyard sign bunker vessel agreement Peninsula CEO seals deal to build LNG bunker vessel  

Agreement signed through shipping company Hercules Tanker Management.

Illustration of Kotug tugboat and the logos of Auramarine and Sanmar Shipyards. Auramarine supply system chosen for landmark methanol-fuelled tugs  

Vessels to enter into service in mid-2025.

A Maersk vessel, pictured from above. Rise in bunker costs hurts Maersk profit  

Shipper blames reroutings via Cape of Good Hope and fuel price increase.

Claus Bulch Klausen, CEO of Dan-Bunkering. Dan-Bunkering posts profit rise in 2023-24  

EBT climbs to $46.8m, whilst revenue dips from previous year's all-time high.

Chart showing percentage of fuel samples by ISO 8217 version, according to VPS. ISO 8217:2024 'a major step forward' | Steve Bee, VPS  

Revision of international marine fuel standard has addressed a number of the requirements associated with newer fuels, says Group Commercial Director.

Carsten Ladekjær, CEO of Glander International Bunkering. EBT down 45.8% for Glander International Bunkering  

CFO lauds 'resilience' as firm highlights decarbonization achievements over past year.

Anders Grønborg, CEO of KPI OceanConnect. KPI OceanConnect posts 59% drop in pre-tax profit  

Diminished earnings and revenue as sales volume rises by 1m tonnes.

Verde Marine Homepage Delta Energy's ARA team shifts to newly launched Verde Marine  

Physical supplier offering delivery of marine gasoil in the ARA region.


↑  Back to Top