Tue 19 Jun 2018, 07:46 GMT

How to prevent bunker spills: North P&I


P&I club lists the main causes of bunker spills and how they can be avoided.


Image credit: North of England P&I Club
North of England P&I Club (North P&I) has issued an overview of the main causes of bunker spills and how they can be avoided.

The marine insurance provider notes that the environmental impact of spilled heavy fuel oil (HFO) can be more severe than a crude oil cargo - whilst lighter fractions of crude can evaporate, residual fuels will not and are therefore described as 'persistent'.

And whilst the release of fuel oil can occur if a tank is breached - due to a collision or impact with a fixed or floating object (FFO) - North P&I notes that many bunker spills take place during bunkering operations and that the "vast majority" of them can be avoided.

Many bunker spills occur when a fuel tank overflows during the bunkering process, North P&I explains. A ship's storage tanks will be designed to overflow into the designated overflow tank and if the overflow tank fills completely, the fuel spills out of the tank vent head, onto the deck and into the water.

Overflow tanks can also fill up when the bunker manifold is over-pressurised and the system's safety valve relieves the pressure into the overflow tank.

North P&I lists the main causes of bunker spills as being:

- Not acting on overflow alarms

Overflow tanks are fitted with float alarms that activate when a set level is reached. These are usually positioned quite low in the tank to allow plenty of time for the engineers to act. On some vessels, a flow switch is fitted to the manifold safety valve drain line, which activates an alarm if flow is detected. In some incidents, overflow alarms have activated but the crew did not take immediate action to investigate.

- Overflow alarms not fitted or not working

There is no statutory requirement to fit alarms to the overflow system and in such cases crew vigilance and suitable monitoring of the overflow tank contents is vital. For those vessels fitted with such alarms, it is important that they are periodically tested to ensure that they will provide the all-important early warning when it really matters.

- Failure to monitor bunker tank levels

The crew must not rely on tank high level alarms and overflow alarms during bunkering. The tank levels must be monitored throughout, paying particular attention when tanks are almost full and changing over to new tanks. If the wrong valve is accidentally operated, a tank level could rise and overflow unless detected and corrected by a vigilant engineer.

- No effective watch at the bunker station

The bunker station should be manned during the bunkering operation. This not only provides visual monitoring and checking for pollution, but is also an important means of communicating with the supplying vessel or barge.

- Communication between bunker barge and receiving vessel

There must be a means of communication between the supplying and receiving vessels' personnel at all times. If a problem occurs that requires an emergency stop of the transfer, the two vessels must be able to communicate immediately. It is good practice to test these communication channels prior to commencing operations.

- Not following procedures or the bunker checklist

A vessel's bunker checklist can be lengthy and there may be a temptation to bypass some of the instructions to speed up the process. This can have costly consequences. Shipowners should ensure that the checklist and supporting policies and procedures are sensible and workable. The vessel's crew must appreciate the importance of the procedures and understand their purpose.

- Supplier exceeding maximum pressure or flow rate

Before bunkering commences, the supplying and receiving vessel must agree a maximum transfer rate and a maximum pumping pressure. There have been instances where the supplier has attempted to exceed these limits to speed up the transfer and has resulted in overflow.

- Defects to bunker piping or tanks

Less common are spills caused by defects to the bunker piping or tanks. Bunker system pipework, fittings and vents that are poorly maintained or neglected can fail in service. Implementing and following a sensible but robust planned maintenance program will prevent the bunker system failing into such a dangerous condition.


ESVAGT Robert Boyle vessel at the Port of Immingham. UK's first commercial biomethanol bunkering service launches at Immingham  

Exolum, Methanex and Ørsted partner to supply biomethanol for shipping at the UK's largest port by tonnage.

Vitol Bunkers vessel alongside terminal facility. Vitol Bunkers launches HSFO supply in Pakistan after four-year hiatus  

Company resumes high-sulphur fuel oil bunkering at three Pakistani ports following earlier VLSFO and LSMGO launches.

Aerial view of CIMC SOE shipyard facility. CIMC SOE secures orders for three LNG bunkering vessels  

Chinese shipbuilder adds two 20,000 cbm and one 18,900 cbm LNG bunkering vessels to order book.

HADAG Type 2030e ferry render. Lehmann Marine to supply battery systems for Hamburg’s first electric ferries  

German firm wins contract for three 3.8 MWh systems for HADAG vessels entering service in 2028.

Viking Glory vessel. Viking Line green corridor project marks two years with biogas use and shore power progress  

Turku-Stockholm route partnership reports tenfold increase in renewable biogas use and advancing electrification infrastructure.

MV Blue Alliance vessel. Global Fuel Supply unveils Blue Alliance tanker after Dubai upgrade works  

Marine fuel supplier completes intermediate survey and technical upgrades on vessel ahead of operational service.

Everllence common-rail technology illustration. Everllence common-rail technology surpasses 20 million operating hours  

Engine maker’s common-rail systems reach milestone across 600 engines and 5,500 cylinders over 18 years.

Representatives from LR Advisory and Geogas. LR Advisory appointed by Geogas Trading to develop FuelEU Maritime compliance strategy  

Lloyd’s Register division to support charterer with emissions planning and FuelEU pooling operationalisation.

Photograph of a red container vessel. ICS survey shows maritime leaders favour LNG as industry awaits IMO net-zero vote  

Barometer reveals strategic shift towards conservative fuel choices amid regulatory uncertainty over decarbonisation framework.

Petrobras logo. Petrobras bunker operations to close for Carnival, with higher prices during holiday period  

Brazilian headquarters shut 16-18 February; Rotterdam office to handle new sales during closure.