Wed 21 Mar 2012 08:49

Fujairah terminal on track for September completion


First phase of 1.2 million cubic metre storage terminal is on course to be completed within six months.



Gulf Petrochem Group has announced that the first phase of its 1.2 million cubic metre storage terminal project in Fujairah is on track for completion in September 2012.

Gulf Petrochem’s Fujairah storage terminal consists of 112,233 square metre acres, which include up to 73,269 square metres of expansion capability. It currently offers a capacity of approximately 350,000 cubic metres.

"Our Fujairah storage terminal expansion follows the major success we achieved while operating our terminal in Sharjah’s Hamriyah free zone. The Fujairah terminal leverages the strategic location and infrastructure of the Fujairah port, and we expect our facility to significantly benefit our clients in the region, given our proven understanding of their commercial requirements. We will also look to leverage our market reputation of providing reliable storage solutions at competitive prices, offering tailor-made products, customised term contracts and a fully integrated fuel delivery service," said Sanjeev Sisaudia, Group CEO, Gulf Petrochem Group.

The group had earlier signed an investment agreement with the Government of Fujairah, under which the latter will buy a 12 percent stake in the terminal project.

For the first phase of the project, which will have a storage capacity of 412,000 cubic meters, Gulf Petrochem has awarded a USD 45 million contract to Nico Hydrospace, a subsidiary of Topaz Energy and Marine.

The two oil terminals at Fujairah port together offer seven berths for large tankers and 12 berths for small tankers. Terminal one has a maximum draft of 14 metres and a wharf length of 847 metres, while the second terminal has a maximum draft of 18 metres and a wharf length of 1,400 meters.

Gulf Petrochem will be exhibiting at the Argus Mideast Gulf and Indian Oil Conference 2012 from March 21 to 22, 2012 at Jumeirah Emirates Towers, Dubai. During the conference, Sanjeev Sisaudia and Prerit Goel, Director, are joining other high-profile delegates to discuss key issues affecting the regional industry.

Opening of the IMO Marine Environment Protection Committee (MEPC), 83rd Session, April 7, 2025. IMO approves pricing mechanism based on GHG intensity thresholds  

Charges to be levied on ships that do not meet yearly GHG fuel intensity reduction targets.

Preemraff Göteborg, Preem's wholly owned refinery in Gothenburg, Sweden. VARO Energy expands renewable portfolio with Preem acquisition  

All-cash transaction expected to complete in the latter half of 2025.

Pictured: Biofuel is supplied to NYK Line's Noshiro Maru. The vessel tested biofuel for Tohoku Electric Power in a landmark first for Japan. NYK trials biofuel in milestone coal carrier test  

Vessel is used to test biofuel for domestic utility company.

Pictured (from left): H-Line Shipping CEO Seo Myungdeuk and HJSC CEO Yoo Sang-cheol at the contract signing ceremony for the construction of an 18,000-cbm LNG bunkering vessel. H-Line Shipping orders LNG bunkering vessel  

Vessel with 18,000-cbm capacity to run on both LNG and MDO.

Stanley George, VPS Group Technical and Science Manager, VPS. How to engineer and manage green shipping fuels | Stanley George, VPS  

Effective management strategies and insights for evolving fuel use.

Sweden flag with water in background. Swedish government bans scrubber wastewater discharges  

Discharges from open-loop scrubbers to be prohibited in Swedish waters from July 2025.

The ME-LGIA test engine at MAN's Research Centre Copenhagen. MAN Energy Solutions achieves 100% load milestone for ammonia engine  

Latest tests validate fuel injection system throughout the entire load curve.

Terminal Aquaviário de Rio Grande (TERIG), operated by Transpetro. Petrobras secures ISCC EU RED certification for B24 biofuel blend at Rio Grande  

Blend consisting of 24% FAME is said to have been rigorously tested to meet international standards.

Avenir LNG logo on sea background. Stolt-Nielsen to fully control Avenir LNG with acquisition  

Share purchase agreement to buy all shares from Golar LNG and Aequitas.

Seaspan Energy's 7,600 cbm LNG bunkering vessel, s1067, built by Nantong CIMC Sinopacific Offshore & Engineering Co., Ltd. Bureau Veritas supports launch of CIMC SOE's LNG bunkering vessel  

Handover of Seaspan Energy's cutting-edge 7,600-cbm vessel completed.


↑  Back to Top