Thu 25 Nov 2010 08:01

Abu Dhabi pipeline to Fujairah completed


Pipeline allowing Abu Dhabi crude to bypass the Strait of Hormuz [pictured] has been completed.



A pipeline running from Abu Dhabi's largest oil fields to Fujairah, allowing crude oil to bypass the Strait of Hormuz [pictured], has been completed, according to project operators International Petroleum Investment Company (IPIC).

The 48-inch diameter, 400-kilometre long pipeline, which runs overland from the Habshan oil fields to Fujairah, is scheduled to begin transporting Murban blend crude oil on a trial basis in December before the project is fully commissioned. IPIC plans for the pipeline to reach a maximum capacity of 1.8 million barrels per day (bpd).

The completion of the project means that Abu Dhabi will now be able to bypass the risky Hormuz Strait, through which approximately a fifth of the world's crude exports, including all of Abu Dhabi's exports of about 2 million barrels, pass every day.

IPIC began construction of the pipeline in 2008 and had planned to finish the project last year, but completion was delayed by difficulties in procuring building materials. The total cost of the project is estimated at around Dh12 billion, one of the largest pipeline ventures in the Middle East.

The pipeline is a boon for Fujairah, already the leading bunkering hub in the Middle East and second only to Singapore in terms of supply volumes.

In addition to the pipeline, a crude reservoir is being set up in Fujairah for oil to be loaded aboard tankers.

The new naval base, a new oil export terminal, offshore loading facilities and a planned 500,000 bpd refinery to be built by IPIC and ConocoPhillips will all help to boost Fujairah's economy - and bunker sales volumes as a result.

The importance of the United Arab Emirates as a leading energy hub will also be bolstered by plans over the next three years to double the number of fuel storage tanks in the region.

Martin Vorgod, CEO of Global Risk Management. Martin Vorgod elevated to CEO of Global Risk Management  

Vorgod, currently CCO at GRM, will officially step in as CEO on December 1, succeeding Peder Møller.

Dorthe Bendtsen, KPI OceanConnect. Dorthe Bendtsen named interim CEO of KPI OceanConnect  

Officer with background in operations and governance to steer firm through transition as it searches for permanent leadership.

Bunker Holding's executive management team, from left to right: CCO Anders Grønborg,  COO Peder Møller, CEO Keld R. Demant and CFO Michael Krabbe. Bunker Holding revamps commercial department and management team  

CCO departs; commercial activities divided into sales and operations.

Image of a bunker delivery being performed by Peninsula's Hercules 8000 tanker vessel. Peninsula extends UAE coverage into Abu Dhabi and Jebel Ali  

Supplier to provide 'full range of products' after securing bunker licences.

A screenshot taken from Peninsula's homepage on October 4, 2024. Peninsula to receive first of four tankers in Q2 2025  

Methanol-ready vessels form part of bunker supplier's fleet renewal programme.

Stephen Robinson, pictured on his appointment as Head of Bunker Strategy and Procurement at Tankers International. Stephen Robinson heads up bunker desk at Tankers International  

Former Bomin and Cockett MD appointed Head of Bunker Strategy and Procurement.

Chart showing percentage of off-spec and on-spec samples by fuel type, according to VPS. Is your vessel fully protected from the dangers of poor-quality fuel? | Steve Bee, VPS  

Commercial Director highlights issues linked to purchasing fuel and testing quality against old marine fuel standards.

Ships at the Tecon container terminal at the Port of Suape, Brazil. GDE Marine targets Suape LSMGO by year-end  

Expansion plan revealed following '100% incident-free' first month of VLSFO deliveries.

Hercules Tanker Management and Hyundai Mipo Dockyard sign bunker vessel agreement Peninsula CEO seals deal to build LNG bunker vessel  

Agreement signed through shipping company Hercules Tanker Management.

Illustration of Kotug tugboat and the logos of Auramarine and Sanmar Shipyards. Auramarine supply system chosen for landmark methanol-fuelled tugs  

Vessels to enter into service in mid-2025.


↑  Back to Top