Mon 11 Oct 2010 07:57

Jamaican cruise port nears completion


Historic Falmouth Cruise Port is expected to open in January 2011.



A new multimillion-dollar cruise port is nearing completion in Falmouth, Jamaica. Known as Historic Falmouth Cruise Port, the facility is expected to open in January 2011.

The $170 million port is currently being constructed by Royal Caribbean Cruises and the Port Authority of Jamaica. Once completed it will be able to berth an Oasis-class ship (the world's largest) and a Freedom-class ship simultaneously.

Falmouth, located on the North Coast between Montego Bay and Ocho Rios, was one of the busiest ports in Jamaica during the late eighteenth and early nineteenth centuries, operating as a major sugar, rum and slave trade port during this period. However, the port's fortunes as a commercial centre declined in the 1840s.

The new project is expected to bring 10,000 visitors per week to Jamaica after its opening at the beginning of next year.

The first Royal Caribbean vessel to call at Historic Falmouth Cruise Port will be Navigator of the Seas, on a sailing from Port Everglades on January 3rd.

Pictured: Royal Caribbean cruise ship Oasis of the Seas

Chart showing percentage of off-spec and on-spec samples by fuel type, according to VPS. Is your vessel fully protected from the dangers of poor-quality fuel? | Steve Bee, VPS  

Commercial Director highlights issues linked to purchasing fuel and testing quality against old marine fuel standards.

Ships at the Tecon container terminal at the Port of Suape, Brazil. GDE Marine targets Suape LSMGO by year-end  

Expansion plan revealed following '100% incident-free' first month of VLSFO deliveries.

Hercules Tanker Management and Hyundai Mipo Dockyard sign bunker vessel agreement Peninsula CEO seals deal to build LNG bunker vessel  

Agreement signed through shipping company Hercules Tanker Management.

Illustration of Kotug tugboat and the logos of Auramarine and Sanmar Shipyards. Auramarine supply system chosen for landmark methanol-fuelled tugs  

Vessels to enter into service in mid-2025.

A Maersk vessel, pictured from above. Rise in bunker costs hurts Maersk profit  

Shipper blames reroutings via Cape of Good Hope and fuel price increase.

Claus Bulch Klausen, CEO of Dan-Bunkering. Dan-Bunkering posts profit rise in 2023-24  

EBT climbs to $46.8m, whilst revenue dips from previous year's all-time high.

Chart showing percentage of fuel samples by ISO 8217 version, according to VPS. ISO 8217:2024 'a major step forward' | Steve Bee, VPS  

Revision of international marine fuel standard has addressed a number of the requirements associated with newer fuels, says Group Commercial Director.

Carsten Ladekjær, CEO of Glander International Bunkering. EBT down 45.8% for Glander International Bunkering  

CFO lauds 'resilience' as firm highlights decarbonization achievements over past year.

Anders Grønborg, CEO of KPI OceanConnect. KPI OceanConnect posts 59% drop in pre-tax profit  

Diminished earnings and revenue as sales volume rises by 1m tonnes.

Verde Marine Homepage Delta Energy's ARA team shifts to newly launched Verde Marine  

Physical supplier offering delivery of marine gasoil in the ARA region.


↑  Back to Top


 Related Links