Fri 7 May 2010 09:56

'Successful' deliveries for first SGX 380-cst contract


SGX announces the completion of loading for all deliverable positions of its April 380-cst contract.



The Singapore Exchange (SGX) has announced the successful completion of the loading for all physical deliverable positions of its first SGX Fuel Oil 380cst (SGX FO380) futures contract.

The SGX FO380 futures contract, launched on 22 February 2010, aims to provide an alternative hedging and trading tool for Singapore fuel oil industry.

The first contract month of April 2010 expired on 25 March 2010 with 131 lots (13,100 mt) of fuel oil for delivery. All deliverable parcels matched by the exchange were successfully loaded by end of April 2010.

The counterparties who participated in the April 2010 delivery included Hin Leong, ENOC Singapore and Glencore Singapore.

Ms Elena Sng, Senior Vice President, Clearing and Commodities Business at SGX said, “The deliveries in this first contract month bear testament to interest in the physical delivery aspect of the contract. We will continue to work closely with our market participants to meet the needs of the evolving market.”

Mr Tayyeb Al Mulla, CEO, ENOC said, “The successful delivery for the first contract month is a confirmation of SGX’s delivery mechanism. We are satisfied and hope that this will encourage greater participation in the contract.”

The SGX FO380 futures contract for the month of May 2010 expired on 26 April 2010 with 256 lots (25,600mt) of fuel oil due for delivery in the month of May 2010.

SGX Fuel Oil 380cst Futures Contract Specifications:

Product:
Fuel Oil 380cst

Trading Unit:
100 tonnes (1 lot)

Minimum Price Fluctuation:
US$0.10 per tonne (US$10.00 per tick)

Contract Months:
12 consecutive months

Trading Hours(Singapore Time):

T Session:
Pre -Opening - 9.15 am - 9.28 am
Non -Cancel Period - 9.28 am - 9.30 am
Opening - 9.30 am - 6.30 pm

T+1 Session:
Pre -Opening - 7.15 pm - 7.28 pm
Non -Cancel Period - 7.28 pm - 7.30 pm
Opening - 7.30 pm - 1.00 am

Daily Price Limit:
An initial price limit of +/- 15% from the latest daily settlement price shall be in force. If the price reaches the initial price limit, a 15-minute cooling off period shall come into effect where trading at or within the price limit of 15% is allowed.

Following the cooling off period, the final price limit of +/-20% from the latest daily settlement price shall come into force. If the price reaches the final price limit, a second 15-minute cooling off period shall come into effect where trading at or within the price limit of 20% is allowed.

Following the second cooling off period, there will be no price limits for the rest of the trading session.

There shall be no price limits on the Last Trading Day for the expiring contract.

Last Trading Day:
5th business day prior to the 1st day of the Contract Month

Minimum Deliverable Size:
20 lots

Delivery Method:
1. FOB SGX Designated Approved Installations, Singapore; and/or
2. Inter-tank transfer at SGX Designated Approved Installations, Singapore
Exchange Delivery Settlement Price:
Daily Settlement Price on the Last Trading Day

Position Limit:
10,000 lots net long or net short for all Contract Months combined
8,000 lots net long or net short for any individual Contract Month
4,000 lots net long or net short in the front Contract Month

Negotiated Large Trades:
Minimum 30 lots

Exchange of Futures for Swaps (EFS)/ Exchange of Futures for Physicals (EFP):
Available

Martin Vorgod, CEO of Global Risk Management. Martin Vorgod elevated to CEO of Global Risk Management  

Vorgod, currently CCO at GRM, will officially step in as CEO on December 1, succeeding Peder Møller.

Dorthe Bendtsen, KPI OceanConnect. Dorthe Bendtsen named interim CEO of KPI OceanConnect  

Officer with background in operations and governance to steer firm through transition as it searches for permanent leadership.

Bunker Holding's executive management team, from left to right: CCO Anders Grønborg,  COO Peder Møller, CEO Keld R. Demant and CFO Michael Krabbe. Bunker Holding revamps commercial department and management team  

CCO departs; commercial activities divided into sales and operations.

Image of a bunker delivery being performed by Peninsula's Hercules 8000 tanker vessel. Peninsula extends UAE coverage into Abu Dhabi and Jebel Ali  

Supplier to provide 'full range of products' after securing bunker licences.

A screenshot taken from Peninsula's homepage on October 4, 2024. Peninsula to receive first of four tankers in Q2 2025  

Methanol-ready vessels form part of bunker supplier's fleet renewal programme.

Stephen Robinson, pictured on his appointment as Head of Bunker Strategy and Procurement at Tankers International. Stephen Robinson heads up bunker desk at Tankers International  

Former Bomin and Cockett MD appointed Head of Bunker Strategy and Procurement.

Chart showing percentage of off-spec and on-spec samples by fuel type, according to VPS. Is your vessel fully protected from the dangers of poor-quality fuel? | Steve Bee, VPS  

Commercial Director highlights issues linked to purchasing fuel and testing quality against old marine fuel standards.

Ships at the Tecon container terminal at the Port of Suape, Brazil. GDE Marine targets Suape LSMGO by year-end  

Expansion plan revealed following '100% incident-free' first month of VLSFO deliveries.

Hercules Tanker Management and Hyundai Mipo Dockyard sign bunker vessel agreement Peninsula CEO seals deal to build LNG bunker vessel  

Agreement signed through shipping company Hercules Tanker Management.

Illustration of Kotug tugboat and the logos of Auramarine and Sanmar Shipyards. Auramarine supply system chosen for landmark methanol-fuelled tugs  

Vessels to enter into service in mid-2025.


↑  Back to Top