Tue 21 Apr 2009 20:58

Aegean acquires double-hull bunkering tanker


Vessel is expected to be deployed to West Africa by the end of Q2 2009.



Aegean Marine Petroleum Network Inc. has today announced it has taken delivery of the Linnea, a 1980-built 11,520 dwt double-hull bunkering tanker to be renamed the Aegean Star, following the company's agreement to purchase the vessel from a third party.

The Aegean Star is expected to be deployed to the West African market by the end of the second quarter of 2009.

Commenting on the news, E. Nikolas Tavlarios, President, said "With the strategic acquisition of the Aegean Star, Aegean has further strengthened its logistics infrastructure in West Africa. The vessel's significant delivery capacity provides the ability to extend Aegean's reach to more markets located on the Gulf of Guinea and increase sales volumes in this growing region.

"Consistent with our focus on expanding future sales volumes, we plan to commence operations in Tangiers, Morocco and Trinidad and Tobago during the current second quarter and expect to take delivery of 19 remaining double-hull bunkering tanker newbuildings by the end of 2010," Tavlarios added.

Aegean Marine Petroleum began making deliveries of marine fuel in West Africa at the beginning of 2008 when the company stationed its own floating storage tanker M/T Fos off the coast of Ghana. The vessel, which has a total storage capacity of 67,000 metric tonnes, is anchored off Tema.

Aegean also has three bunker vessels, M/T Aegean Tulip, M/T Aegean VII and Medoil III which are able to make delveries in various locations including Ivory Coast, Togo, Benin, Nigeria, Cameroon, Equatorial Guinea and Gabon.

Port of Gothenburg Energy Port. Swedish biomethane bunkered in Gothenburg  

Test delivery performed by St1 and St1 Biokraft, who aim to become large-scale suppliers.

Image from Cockett Marine Oil presentation. Cockett to be closed down after 45 years  

End of an era as shareholders make decision based on 'non-core nature' of Cockett's business.

Petrobras logo. Petrobras confirms prompt availability of VLS B24 at Rio Grande  

Lead time for barge deliveries currently five days.

Opening of the IMO Marine Environment Protection Committee (MEPC), 83rd Session, April 7, 2025. IMO approves pricing mechanism based on GHG intensity thresholds  

Charges to be levied on ships that do not meet yearly GHG fuel intensity reduction targets.

Preemraff Göteborg, Preem's wholly owned refinery in Gothenburg, Sweden. VARO Energy expands renewable portfolio with Preem acquisition  

All-cash transaction expected to complete in the latter half of 2025.

Pictured: Biofuel is supplied to NYK Line's Noshiro Maru. The vessel tested biofuel for Tohoku Electric Power in a landmark first for Japan. NYK trials biofuel in milestone coal carrier test  

Vessel is used to test biofuel for domestic utility company.

Pictured (from left): H-Line Shipping CEO Seo Myungdeuk and HJSC CEO Yoo Sang-cheol at the contract signing ceremony for the construction of an 18,000-cbm LNG bunkering vessel. H-Line Shipping orders LNG bunkering vessel  

Vessel with 18,000-cbm capacity to run on both LNG and MDO.

Stanley George, VPS Group Technical and Science Manager, VPS. How to engineer and manage green shipping fuels | Stanley George, VPS  

Effective management strategies and insights for evolving fuel use.

Sweden flag with water in background. Swedish government bans scrubber wastewater discharges  

Discharges from open-loop scrubbers to be prohibited in Swedish waters from July 2025.

The ME-LGIA test engine at MAN's Research Centre Copenhagen. MAN Energy Solutions achieves 100% load milestone for ammonia engine  

Latest tests validate fuel injection system throughout the entire load curve.


↑  Back to Top


 Related Links