Fri 3 Apr 2009 08:04

Long Beach to review 'eco-project' in April


Project proposes to use new technologies and cleaner fuels to cut ship emissions.



The Long Beach Board of Harbor Commissioners on Monday, April 13th 2009, at 8:30 a.m. will consider the final environmental impact report/environmental impact statement for the Middle Harbor Redevelopment Project, which will aim to make Long Beach one of the world's most envoronmentally-friendly ports.

The proposed $750-million, 10-year project would modernize two older shipping terminals and cut air pollution at those terminals by 50 percent or more from existing levels.

The project proposes to use new technologies and cleaner fuels to minimize or eliminate the environmental impacts of shipping operations. For example, all ships would be required to plug into shore-side electrical power and shut down their diesel engines at berth, and use low-sulphur fuels for their main and auxiliary engines as they travel in and out of port.

Among other environmentally friendly measures, the project would require lower-emission switching locomotives, alternative-fuel powered cargo equipment, compliance with the Green Flag vessel speed reduction program, cleaner tugboats and barges, “green” building (LEED) standards for terminal buildings and the reuse or recycling of waste materials during construction.

The Port staff is recommending that the Board also allocate at least $15 million to further offset environmental impacts in the local community. Under the proposal, the Port would fund $5 million or more on grants to schools, $5 million or more for health-care and seniors facilities, and $5 million or more on programs to reduce greenhouse gases.

The final environmental report was released on April 2nd. Previously, the draft report was circulated in May and June 2008 for 80 days of public review and comment. In the final, 1,500-page report, the Port responds to hundreds of comments and questions from the public collected during the review period.

The Middle Harbor Redevelopment Project proposes to modernize and reconfigure two older, irregularly shaped container shipping terminals to create one rectangular-shaped facility that would operate in a more efficient and environmentally friendly manner. In addition to the thousands of new permanent jobs, the project would also generate about 1,000 construction jobs a year during the 10 years of construction.

Updating the older terminals would enable the Port to fully implement the aggressive environmental measures in its Green Port Policy and Clean Air Action Plan, significantly cutting air pollution even as containerized trade increases. The project would expand Middle Harbor's on-dock rail infrastructure significantly to move more cargo by rail directly from the waterfront.

"This project is needed to modernize aging Port infrastructure, keep Long Beach competitive in the business of international trade and create local jobs," said Port Executive Director Richard D. Steinke.

With the extensive reductions in environmental impacts outlined in the EIR, the new shipping facilities would be among the “greenest” in operation at any global seaport, Steinke added.

“As proposed in this environmental report, the Middle Harbor project would create the most environmentally responsible shipping terminal anywhere in the world,” Steinke said.

“It fulfills our responsibilities to the environment, economy and community, as it would provide many thousands of new jobs in Southern California while reducing air pollution.”

The report is a joint document produced by the Port and the U.S. Army Corps of Engineers.

The meeting on the Middle Harbor EIR will be held April 13 at 8:30 a.m. at the Port Administration Building, 925 Harbor Plaza, in Long Beach.

Martin Vorgod, CEO of Global Risk Management. Martin Vorgod elevated to CEO of Global Risk Management  

Vorgod, currently CCO at GRM, will officially step in as CEO on December 1, succeeding Peder Møller.

Dorthe Bendtsen, KPI OceanConnect. Dorthe Bendtsen named interim CEO of KPI OceanConnect  

Officer with background in operations and governance to steer firm through transition as it searches for permanent leadership.

Bunker Holding's executive management team, from left to right: CCO Anders Grønborg,  COO Peder Møller, CEO Keld R. Demant and CFO Michael Krabbe. Bunker Holding revamps commercial department and management team  

CCO departs; commercial activities divided into sales and operations.

Image of a bunker delivery being performed by Peninsula's Hercules 8000 tanker vessel. Peninsula extends UAE coverage into Abu Dhabi and Jebel Ali  

Supplier to provide 'full range of products' after securing bunker licences.

A screenshot taken from Peninsula's homepage on October 4, 2024. Peninsula to receive first of four tankers in Q2 2025  

Methanol-ready vessels form part of bunker supplier's fleet renewal programme.

Stephen Robinson, pictured on his appointment as Head of Bunker Strategy and Procurement at Tankers International. Stephen Robinson heads up bunker desk at Tankers International  

Former Bomin and Cockett MD appointed Head of Bunker Strategy and Procurement.

Chart showing percentage of off-spec and on-spec samples by fuel type, according to VPS. Is your vessel fully protected from the dangers of poor-quality fuel? | Steve Bee, VPS  

Commercial Director highlights issues linked to purchasing fuel and testing quality against old marine fuel standards.

Ships at the Tecon container terminal at the Port of Suape, Brazil. GDE Marine targets Suape LSMGO by year-end  

Expansion plan revealed following '100% incident-free' first month of VLSFO deliveries.

Hercules Tanker Management and Hyundai Mipo Dockyard sign bunker vessel agreement Peninsula CEO seals deal to build LNG bunker vessel  

Agreement signed through shipping company Hercules Tanker Management.

Illustration of Kotug tugboat and the logos of Auramarine and Sanmar Shipyards. Auramarine supply system chosen for landmark methanol-fuelled tugs  

Vessels to enter into service in mid-2025.


↑  Back to Top


 Related Links