Thu 4 Dec 2008 08:02

Slow steaming kit to cut fuel costs


Upgrade kit aims to enable ships to sail at 60 percent full speed.



Finnish engine manufacturer Wärtsilä has introduced a new upgrade kit for slow steaming for low-speed engines, which aims to enable shipowners and operators to make major savings in fuel costs while slow steaming their ships.

The upgrade kit allows Wärtsilä low-speed marine engines to be operated continuously at any power in the range of 20 to 100 percent. This means that with the upgrade kit ships can sail continuously at sea speeds down to some 60 percent full speed.

High bunker prices have put fuel efficiency high on the agenda of charterers, shipowners and ship operators. This has has led to considerable interest in slow steaming, which is when ships are operated for long periods at reduced sea speeds.

Yet without modification with the new upgrade kit, Wärtsilä says there is increased risk of engine fouling and excessive component temperatures when operating continuously below 50 percent engine load.

The upgrade kit overcomes such problems, according to Wärtsilä. The modified engine is not permanently derated but can operate at any time up to its full installed power.

The concept of the upgrade kit is to cut out a turbocharger when the engine is to be operated at low load. This increases the scavenge air delivery at low load for better combustion and more optimum temperatures of engine components. This means more efficient fuel consumption, which helps to cut ship owners' fuel costs and to reduce emissions.

The first upgrade kits were ordered in November 2008 by the German owner Koepping Shipping Company for two container vessels, each with a Wärtsilä low-speed engine. The two ships, "Aglaia" [pictured] and "Lantau Arrow", are fast feeder container vessels.

Joerg Koepping, Managing Director of Koepping Shipping, said "The Slow-Steaming Upgrade Kits will give these ships considerable flexibility to adapt to the present difficult market conditions, allowing great cost savings while slow steaming but retaining the capability for full speed whenever necessary."

The upgrade kit is available for all RTA and RT-flex engines with multiple turbochargers. It is delivered by Wärtsilä on a turn-key basis and includes engine performance analysis, cabling and installation, all materials and their transport, service engineers to undertake the whole installation and commissioning, and emission measurement and certification.

The installation and commissioning of the upgrade kit can be completed during normal commercial operation of the ship and during normal port calls.

Martin Vorgod, CEO of Global Risk Management. Martin Vorgod elevated to CEO of Global Risk Management  

Vorgod, currently CCO at GRM, will officially step in as CEO on December 1, succeeding Peder Møller.

Dorthe Bendtsen, KPI OceanConnect. Dorthe Bendtsen named interim CEO of KPI OceanConnect  

Officer with background in operations and governance to steer firm through transition as it searches for permanent leadership.

Bunker Holding's executive management team, from left to right: CCO Anders Grønborg,  COO Peder Møller, CEO Keld R. Demant and CFO Michael Krabbe. Bunker Holding revamps commercial department and management team  

CCO departs; commercial activities divided into sales and operations.

Image of a bunker delivery being performed by Peninsula's Hercules 8000 tanker vessel. Peninsula extends UAE coverage into Abu Dhabi and Jebel Ali  

Supplier to provide 'full range of products' after securing bunker licences.

A screenshot taken from Peninsula's homepage on October 4, 2024. Peninsula to receive first of four tankers in Q2 2025  

Methanol-ready vessels form part of bunker supplier's fleet renewal programme.

Stephen Robinson, pictured on his appointment as Head of Bunker Strategy and Procurement at Tankers International. Stephen Robinson heads up bunker desk at Tankers International  

Former Bomin and Cockett MD appointed Head of Bunker Strategy and Procurement.

Chart showing percentage of off-spec and on-spec samples by fuel type, according to VPS. Is your vessel fully protected from the dangers of poor-quality fuel? | Steve Bee, VPS  

Commercial Director highlights issues linked to purchasing fuel and testing quality against old marine fuel standards.

Ships at the Tecon container terminal at the Port of Suape, Brazil. GDE Marine targets Suape LSMGO by year-end  

Expansion plan revealed following '100% incident-free' first month of VLSFO deliveries.

Hercules Tanker Management and Hyundai Mipo Dockyard sign bunker vessel agreement Peninsula CEO seals deal to build LNG bunker vessel  

Agreement signed through shipping company Hercules Tanker Management.

Illustration of Kotug tugboat and the logos of Auramarine and Sanmar Shipyards. Auramarine supply system chosen for landmark methanol-fuelled tugs  

Vessels to enter into service in mid-2025.


↑  Back to Top