Thu 11 Dec 2014 20:20

ABS releases guide for LNG-ready ships


Guide is designed to help owners prepare newbuildings for future conversion to gas propulsion.



The American Bureau of Shipping (ABS) - a leading global provider of classification services to the marine and offshore industries - has released a guide for LNG-ready ships.

The 'ABS Guide for LNG Fuel Ready Vessels' is designed to support members and clients in preparing newbuildings for future conversion to gas propulsion.

Its purpose it to formalize the process for companies who wish to plan for conversion to LNG fuel at a future date by providing a detailed review and approval and an associated class notation.

"ABS is a leader in LNG as fuel, with a number of newbuilding and conversion projects in progress, and there is strong interest in preparing for a future in which LNG takes a bigger role," said ABS Chairman and CEO Christopher J. Wiernicki. "The Guide for LNG Fuel Ready Vessels draws on our practical experience by providing a detailed approval process and a notation that clarifies the extent to which a vessel is LNG Fuel Ready."

The guide includes a basic level of Concept Design Approval, with a design review for approval in principle (AIP), and two optional levels for general design approval and installed equipment, which constitute a complete review and survey of the system to be installed on the ship.

The first optional level is a General Design Review that allows an owner to approach a shipyard with a reviewed design package for the gas-fueled system at the time of conversion.

The second optional level is Detail Design Approval and Installation, which constitutes a complete design review and survey of a system that will be installed on the LNG-ready ship in accordance with the ABS Guide for Propulsion and Auxiliary Systems for Gas Fueled Ships.

The first level provides an AIP and a descriptive note in the ABS Record, the second level a Statement of Compliance with a descriptive note listing the parts of the system that have been reviewed. The third level results in an LNG Fuel Ready class notation for the parts of the system that have been installed, confirming that the fuel system is in full compliance with the ABS Guide to Gas Fueled Ships at the time of the newbuilding contract.

“The projects ABS has already worked on demonstrate the variability from the designer’s and owner’s perspective of the requirements associated with the term LNG Ready,” commented ABS Vice President of Global Gas Solutions, Patrick Janssens. "Rather than rely solely on current notations and descriptive notes to express to what extent a ship is LNG ready, the ABS Guide and notation are powerful tools that go beyond the basics to help clients specify work to be done in the construction phase and when they are ready to convert."

Martin Vorgod, CEO of Global Risk Management. Martin Vorgod elevated to CEO of Global Risk Management  

Vorgod, currently CCO at GRM, will officially step in as CEO on December 1, succeeding Peder Møller.

Dorthe Bendtsen, KPI OceanConnect. Dorthe Bendtsen named interim CEO of KPI OceanConnect  

Officer with background in operations and governance to steer firm through transition as it searches for permanent leadership.

Bunker Holding's executive management team, from left to right: CCO Anders Grønborg,  COO Peder Møller, CEO Keld R. Demant and CFO Michael Krabbe. Bunker Holding revamps commercial department and management team  

CCO departs; commercial activities divided into sales and operations.

Image of a bunker delivery being performed by Peninsula's Hercules 8000 tanker vessel. Peninsula extends UAE coverage into Abu Dhabi and Jebel Ali  

Supplier to provide 'full range of products' after securing bunker licences.

A screenshot taken from Peninsula's homepage on October 4, 2024. Peninsula to receive first of four tankers in Q2 2025  

Methanol-ready vessels form part of bunker supplier's fleet renewal programme.

Stephen Robinson, pictured on his appointment as Head of Bunker Strategy and Procurement at Tankers International. Stephen Robinson heads up bunker desk at Tankers International  

Former Bomin and Cockett MD appointed Head of Bunker Strategy and Procurement.

Chart showing percentage of off-spec and on-spec samples by fuel type, according to VPS. Is your vessel fully protected from the dangers of poor-quality fuel? | Steve Bee, VPS  

Commercial Director highlights issues linked to purchasing fuel and testing quality against old marine fuel standards.

Ships at the Tecon container terminal at the Port of Suape, Brazil. GDE Marine targets Suape LSMGO by year-end  

Expansion plan revealed following '100% incident-free' first month of VLSFO deliveries.

Hercules Tanker Management and Hyundai Mipo Dockyard sign bunker vessel agreement Peninsula CEO seals deal to build LNG bunker vessel  

Agreement signed through shipping company Hercules Tanker Management.

Illustration of Kotug tugboat and the logos of Auramarine and Sanmar Shipyards. Auramarine supply system chosen for landmark methanol-fuelled tugs  

Vessels to enter into service in mid-2025.


↑  Back to Top