Thu 10 Oct 2013 12:32

GE Marine engine cuts emissions by 50%


Marine diesel engine is said to meet EPA Tier 4i and IMO Tier III emission compliance without exhaust after-treatment.



GE Marine has announced that it is unveiling its ecomagination-qualified 12-cylinder V250 Marine Diesel engine at the International Workboat Show, which is taking place between 9-11 October in New Orleans, United States.

The new engine is said to reduce emissions by 50 percent to meet EPA Tier 4i and IMO Tier III emission compliance. GE’s breakthrough technology eliminates the need for a urea-based after-treatment emissions reduction system. In addition, the 12V250 engine offers increased power of 3,150 kW at 900 rpm and 3,500 kW at 1000 rpm while maintaining low life-cycle cost, reliability and fuel efficiency.

Almost one year ago at the 2012 International Workboat Show, GE announced its timeline for meeting EPA Tier 4i and IMO Tier III emission compliance without the need for Selective Catalytic Reduction system (SCR) exhaust gas after-treatment for its L250 and V250 medium speed marine diesel engines (1,550 – 4,650 kW).

"The display of this engine exemplifies GE Marine's commitment and capability to provide breakthrough technology solutions to the global marine industry," said John Manison, general manager of GE Marine. "Our new technology enables the industry to meet the upcoming emission compliance requirements as well as to reduce both capital and operating expenses.

GE Marine's engine technology eliminates the need for an SCR and storing or using urea aboard a vessel, thereby preserving cargo and tank space.

SCR requires using a diesel exhaust fluid, typically urea, to reduce NOx (nitrous oxide) in an after-treatment of exhaust gas. GE’s non-SCR solution is based on the technological advancements of the L250 and V250 engines and requires no supplemental equipment or fluids.

Opening of the IMO Marine Environment Protection Committee (MEPC), 83rd Session, April 7, 2025. IMO approves pricing mechanism based on GHG intensity thresholds  

Charges to be levied on ships that do not meet yearly GHG fuel intensity reduction targets.

Preemraff Göteborg, Preem's wholly owned refinery in Gothenburg, Sweden. VARO Energy expands renewable portfolio with Preem acquisition  

All-cash transaction expected to complete in the latter half of 2025.

Pictured: Biofuel is supplied to NYK Line's Noshiro Maru. The vessel tested biofuel for Tohoku Electric Power in a landmark first for Japan. NYK trials biofuel in milestone coal carrier test  

Vessel is used to test biofuel for domestic utility company.

Pictured (from left): H-Line Shipping CEO Seo Myungdeuk and HJSC CEO Yoo Sang-cheol at the contract signing ceremony for the construction of an 18,000-cbm LNG bunkering vessel. H-Line Shipping orders LNG bunkering vessel  

Vessel with 18,000-cbm capacity to run on both LNG and MDO.

Stanley George, VPS Group Technical and Science Manager, VPS. How to engineer and manage green shipping fuels | Stanley George, VPS  

Effective management strategies and insights for evolving fuel use.

Sweden flag with water in background. Swedish government bans scrubber wastewater discharges  

Discharges from open-loop scrubbers to be prohibited in Swedish waters from July 2025.

The ME-LGIA test engine at MAN's Research Centre Copenhagen. MAN Energy Solutions achieves 100% load milestone for ammonia engine  

Latest tests validate fuel injection system throughout the entire load curve.

Terminal Aquaviário de Rio Grande (TERIG), operated by Transpetro. Petrobras secures ISCC EU RED certification for B24 biofuel blend at Rio Grande  

Blend consisting of 24% FAME is said to have been rigorously tested to meet international standards.

Avenir LNG logo on sea background. Stolt-Nielsen to fully control Avenir LNG with acquisition  

Share purchase agreement to buy all shares from Golar LNG and Aequitas.

Seaspan Energy's 7,600 cbm LNG bunkering vessel, s1067, built by Nantong CIMC Sinopacific Offshore & Engineering Co., Ltd. Bureau Veritas supports launch of CIMC SOE's LNG bunkering vessel  

Handover of Seaspan Energy's cutting-edge 7,600-cbm vessel completed.


↑  Back to Top